background top icon
background center wave icon
background filled rhombus icon
background two lines icon
background stroke rhombus icon

Download "Секунды до катастрофы: Глубоководный горизонт. HD"

input logo icon
Video tags
|

Video tags

катастрофа
Глубоководный горизонт
National Geographic HD
Subtitles
|

Subtitles

subtitles menu arrow
  • ruRussian
Download
00:00:03
there is an explosion on a drilling platform in the Gulf of Mexico, the
00:00:08
surviving employees leave the platform,
00:00:11
unable to stop the release of the
00:00:15
dump, I said to myself, and either you will get up
00:00:19
or you will remain lying here and die
00:00:23
two hours earlier, tests showed
00:00:25
that the drilling rig is safe, now it
00:00:30
remains to be investigated how the
00:00:32
drilling platform is worth 560
00:00:35
million dollars could have exploded
00:00:36
leading to the largest oil spill
00:00:39
in the sea
00:00:42
why this happened modern drilling
00:00:45
platforms competent company
00:00:47
exceptionally experienced personnel about this
00:00:50
should not have happened
00:00:57
disasters do not happen just like that they
00:01:01
are the result of a chain of decisive
00:01:03
events we will reveal the fateful decisions and
00:01:05
read the last seconds before the disaster the
00:01:08
oil platform deepwater horizon
00:01:11
events reconstructed in full
00:01:13
accordance with official
00:01:14
eyewitness accounts
00:01:16
Gulf of Mexico sixty-six
00:01:20
kilometers from the coast of Louisiana
00:01:24
drilling platform deepwater horizon
00:01:33
April 20, 2010
00:01:37
five o'clock in the evening
00:01:42
senior drilling foreman Miles Randy and the
00:01:46
head of the drilling department of the
00:01:48
trance company already he is on the platform with exemplary
00:01:50
safety indicators,
00:01:52
we were part of a high-ranking
00:01:55
group of specialists from British Petroleum and the
00:01:57
transaction
00:01:58
owner of the work performed a general walk-through of
00:02:00
the platform, the
00:02:01
last place of the walk-through was the modules to the
00:02:04
work site where the
00:02:06
procedure for pressure testing of well 1753 was already carried out,
00:02:13
your drilling rig is
00:02:17
43 days behind schedule, a specialized
00:02:20
drilling platform is preparing for
00:02:21
disconnection from the finished well,
00:02:25
the work is almost completed, the management of a brave
00:02:30
team, the work of the drilling foreman, Wyman
00:02:32
Aguilera, he needs to make sure that the well will
00:02:35
not give way to the furnace if there is a leak, gas and
00:02:38
oil will be thrown towards the
00:02:40
platform with enormous force, he is not carrying out
00:02:43
plans, there were pressure measurements on the
00:02:45
monitors, unusual pressure readings in
00:02:47
the well,
00:02:52
the pressure continues to rise as the
00:02:59
6-hour shift approaching, the
00:03:01
rig's slope room is filled with
00:03:03
night shift employees, the
00:03:06
subsea supervisor, Crisp Leeson,
00:03:08
is responsible for the subsea system of the drilling
00:03:10
platform, he needs to be aware of
00:03:12
all the problems with the well, one swab,
00:03:15
we run around, he was convinced that something was wrong
00:03:19
8300 kilopascals I just can’t
00:03:21
explain this Wyman villar believes that there is a
00:03:25
leak at the well I’m convinced we have problems and
00:03:28
just branded at the door but his shift
00:03:31
is ending
00:03:36
night shift supervisor Jason Anderson
00:03:41
something is wrong with this well she is
00:03:43
sending us a signal
00:03:50
Anderson is taking measurements again
00:03:53
re-carry out the crimping procedure
00:04:03
you looked, I see Jason said why do
00:04:06
n’t you go get a bite to eat and and answered
00:04:08
and really I’ll have a bite to eat and will be back when he
00:04:11
said not necessarily if I
00:04:13
have any problems with this
00:04:15
test then I called 1858
00:04:25
welcome gentlemen you know which one
00:04:27
occasion we gathered we gathered to
00:04:29
celebrate our operation in the conference room
00:04:32
randy and the room again joined the
00:04:34
dignitaries who
00:04:35
congratulated the management of the rig on its
00:04:37
impeccable
00:04:39
safety record over the past seven years this
00:04:41
drilling platform is never just him
00:04:43
gentlemen
00:04:44
applaud yourselves and the waters of your efforts for
00:04:49
seven years a medal wasted by them or
00:04:51
tomorrow lin staff
00:04:55
and in the meantime Anderson is
00:04:57
measuring the pressure they again released the
00:05:01
pressure in the well and are now waiting for the
00:05:03
results one person is responsible for this
00:05:08
and this man randy and the hall
00:05:11
did a great job in the market we are in the gardens
00:05:16
[applause]
00:05:20
Anderson finished the measurement he is sure
00:05:23
that the Medici wells are his
00:05:27
last shift
00:05:28
at the rig, he is going for a promotion,
00:05:30
plans to be there next morning
00:05:32
[music]
00:05:37
2110
00:05:42
she is there models leaving the work site
00:05:45
on my watch it was nine ten social
00:05:48
said Jason before we
00:05:50
disconnect the platform I need go
00:05:52
work on the crane, he asked, are you sure it’s an
00:05:54
unnecessary task, I answered everything
00:05:57
is fine
00:06:02
[music]
00:06:10
before starting the night shift,
00:06:12
Randy and the hall calls Anderson, results of
00:06:16
pressure testing and sulfur will be there, he said that
00:06:18
everything went well quickly, they
00:06:21
checked the pressure for half an hour, there were no leaks I said
00:06:24
ok, I need my help, he answered no,
00:06:27
as before,
00:06:28
saying I have everything under control, go to sleep,
00:06:31
everything is fine, as he was completely sure
00:06:34
ort that all the grafted muse background were
00:06:37
in order, the poster was
00:06:44
21 hours 31 minutes,
00:06:49
it was worth preparing for disconnection when the
00:06:53
drilling team noticed an unexpected
00:06:56
increase pressure this thing is going
00:07:01
crazy never seen anything like this
00:07:08
21 1:41
00:07:15
below deck Chris's assistant prize then
00:07:18
appears on the screen of the drilling surveillance system
00:07:20
eset said Chris what kind of
00:07:25
water is this assorted about itil maybe
00:07:27
it comes from that hole
00:07:30
on and minutes would get said to the hedgehog dirt,
00:07:37
I grabbed the handset and called the
00:07:39
drilling site, there were no answers,
00:07:41
I called all three lines
00:07:45
when already myself and
00:07:47
[music]
00:07:53
mud burst out of the well from a height of
00:07:56
74 meters and fell on board the
00:08:03
drilling staff know that in order to
00:08:05
avoid a disaster, the well must be
00:08:07
immediately taken under control
00:08:09
they shut off the valves in an attempt to
00:08:12
stop the dirt and flammable gas
00:08:13
escaping from the well
00:08:31
[music] should I
00:08:39
come here randy quickly the team
00:08:43
lost control
00:08:44
the well is gushing out the salon and after
00:08:55
Steve’s words were only we had a
00:08:57
coordinated interruption
00:08:58
I was cut off by you all and but said
00:09:03
randy
00:09:04
is needed your help will now
00:09:12
stand quietly and almost and windlessly, but
00:09:15
highly flammable methane
00:09:17
has condensed on the surface of the drilling rig; just
00:09:20
one spark is enough for it to
00:09:22
ignite
00:09:28
as soon as the gas reaches the engine
00:09:30
room of the diesel engine, they are overloaded and
00:09:32
fail 21 hours 49 minutes,
00:09:59
a fountain of burning oil soars hundreds of
00:10:02
meters into the sky,
00:10:09
street 126 people they rush to the
00:10:12
lifeboats
00:10:18
Randy and the call there is no bus among them
00:10:24
I said to myself either you will get up
00:10:26
or you will stay here lying and died
00:10:29
mom your right leg is stuck about
00:10:33
full left with all my might I freed I
00:10:35
then felt something similar to the
00:10:39
air
00:10:44
America I reached the corridor the city and
00:10:47
everything that I first took for air
00:10:48
was actually methane and I felt
00:10:51
droplets, it was a scandal, so I had a
00:10:53
mad look on my face like your measles, he Abel was
00:10:59
seriously wounded, he took a couple of steps over
00:11:05
my shoulder, he was told
00:11:07
to get down,
00:11:08
walk and save yourself with office
00:11:12
go back when I said no we won’t
00:11:16
leave you here
00:11:27
before leaving the drilling platform
00:11:29
Chris the landing party must try to stop
00:11:31
the fire he runs to the bridge to start the
00:11:34
emergency disconnect system, the so-
00:11:36
called
00:11:37
VAT, to shut off the well
00:11:39
on the ocean floor and
00:11:41
prevent the release of oil and gas,
00:11:43
she disconnect platform from the well
00:11:46
is the only way to stop the fire
00:11:49
the only way to save the world
00:11:54
sos sos
00:11:56
and tagged Ryzen motorboat we have an
00:11:58
uncontrollable fire and in gray I said
00:12:04
launches with came to the [ __ ] said
00:12:06
calm down we will not disconnect
00:12:11
sacre-ker I said I must disconnect
00:12:13
from the well and clicked on button and d.s.
00:12:25
oil and gas continue to come out of the well,
00:12:28
fueling the flames and causing explosions, the
00:12:31
emergency disconnection did not work, the
00:12:35
captain returned and said we can
00:12:37
disconnect, to which I replied already rebir,
00:12:49
most of the workers left the platform,
00:12:53
but in the lifeboats of
00:12:59
Egorov 100 we got out of the residential area, the
00:13:01
first thing I saw was that there were lifeguards in the club
00:13:04
Knightley's boats have already been
00:13:07
launched, that they have already left and the hall takes them
00:13:12
to the griller and with them to the spare
00:13:14
life raft, they are among those who
00:13:17
leave the platform, the last one
00:13:21
here, many people do not jump into the water
00:13:24
to escape the unbearable heat, the last
00:13:27
few people remaining on the
00:13:29
platform thrown into the sea from a height of 18 meters
00:13:37
all 115 people who managed to
00:13:39
leave the rig you lived they are gathering
00:13:42
on a supply ship nearby
00:13:45
Jason Andersen the drilling crew
00:13:47
went missing
00:13:50
presumably they died in an
00:13:52
explosion on the drill deck the
00:13:59
oil platform deepwater horizon
00:14:01
burned for 36 hours and then sank crude
00:14:07
oil poured into the Gulf of Mexico,
00:14:14
the world needs to know how a drilling platform with an
00:14:17
exceptional
00:14:19
safety record could suffer a
00:14:21
disaster of this magnitude during a
00:14:23
routine operation when no reaches
00:14:26
the coast of the United States, President
00:14:28
Obama convenes a commission to investigate the
00:14:30
accident,
00:14:32
the disaster currently unfolding
00:14:35
in the Gulf of Mexico may
00:14:37
be the result mistakes of personnel
00:14:39
or corporations taking risks for the sake of and
00:14:42
speeding up work geophysicist Richard Sears
00:14:46
was appointed scientific consultant to
00:14:48
President Obama's national commission
00:14:51
he worked all his life in the
00:14:53
oil industry and was
00:14:55
vice president of the company show what is
00:14:57
more
00:14:58
modern platform competent
00:15:00
companies direct investment in very experienced
00:15:03
personnel and such should not have happened under
00:15:06
any circumstances, what could have gone wrong,
00:15:11
and now by tracking the series of events that
00:15:14
led to the disaster and conducting a detailed
00:15:16
investigation, we will be able to shed light on
00:15:19
how this most complex drilling platform of the
00:15:22
eye burst, which caused the death of
00:15:24
11 people and the emergence of the largest
00:15:27
oil spill full of departure punishment
00:15:33
for us is the key ethyl drilling platform
00:15:35
it holds the record for the depth of the well of
00:15:38
more than ten and a half kilometers
00:15:43
and was serviced by a trans company its
00:15:46
employees have just finished drilling not
00:15:47
Macondo wells for British Petroleum a
00:15:55
huge steel pipe connects the
00:15:58
well you platform one and a half thousand
00:16:00
meters
00:16:02
the well goes to 4000 meters deep into the
00:16:05
earth's crust
00:16:07
there are oil and gas deposits
00:16:09
that are estimated at 110 million
00:16:11
barrels,
00:16:13
but at the moment oil should not
00:16:15
flow into the systems, the
00:16:18
task of the deputy Risen is simply to drill a
00:16:21
well to extract oil, there will be another
00:16:24
platform,
00:16:27
the well will be blocked and temporarily
00:16:29
mothballed,
00:16:36
investigators are beginning to study the process of
00:16:38
conservation, which would have been a
00:16:40
disaster day this is a standard
00:16:42
operation that the team has carried out
00:16:45
several times to
00:16:48
give the frame temporary conservation; this is
00:16:51
when the well is blocked,
00:16:54
concrete plugs are installed,
00:16:55
the capabilities are checked, they are made sure that the
00:16:58
well is stable,
00:17:01
then after a few days or weeks
00:17:04
of my and sometimes months, a
00:17:06
installation arrives to complete the well and
00:17:09
connects it to the corresponding
00:17:11
production facilities out of the water and
00:17:14
acceleration to pinball the
00:17:18
surviving rig workers claim that
00:17:20
Transaction employees installed a
00:17:22
concrete plug in the well and carried out a pressure
00:17:25
test procedure at the wellhead to
00:17:28
check the tightness to make sure
00:17:30
that oil and gas do not enter the system the
00:17:32
well reduces the pressure so that the
00:17:35
pressure inside is less than outside
00:17:40
if there is a leak
00:17:42
oil and gas hydrocarbons will enter the system and an
00:17:45
increase in pressure in the wells will be visible.
00:17:49
You understand the point is to make sure that the
00:17:51
concrete plug at the wellhead
00:17:54
keeps the hydrocarbons inside the
00:17:56
field and does not let milk into it; you
00:17:59
need to make sure that oil and
00:18:02
gas do not rise to the surface only there
00:18:04
will be no need for this
00:18:09
wyman lily the drilling team
00:18:11
monitors changes in pressure inside
00:18:13
the well these pressure readings are also
00:18:16
received on the monitors and the Estonian office of
00:18:18
British Petroleum
00:18:21
Richard Ser now sees exactly the same thing
00:18:24
that the rig employees saw a
00:18:25
few hours before the disaster
00:18:31
from these data it is clearly visible that the pressure
00:18:33
several times rose to almost 10
00:18:36
megapascals if the well had been
00:18:39
sealed the pressure would have remained
00:18:41
constant the
00:18:43
heart sees only one explanation
00:18:47
there is this means that there is a path along
00:18:51
which oil and gas can get into the
00:18:53
well means a plug at the
00:18:56
wellhead there is not ideal strengthening
00:19:01
workers told investigators that
00:19:03
Jason Anderson interpreted the reading as
00:19:06
9600 kilopascals hey otherwise he sat down the
00:19:11
increase in pressure in the addition
00:19:13
due to instrumentation error caused by the bubble effect
00:19:17
he decided that the weight of the liquid in the pipeline
00:19:21
caused the effect of a full bubble
00:19:23
transferring pressure through the closed valve
00:19:26
which led to an increase in pressure in the
00:19:28
well the
00:19:30
head of the drilling british petroleum accepted
00:19:33
Jason's explanations Anderson about the
00:19:36
bubble effect, making the final decision
00:19:39
as to whether the well passed the
00:19:41
test, he agreed that 9700
00:19:44
kilopascals was an instrument error,
00:19:48
but Richard Cyr believes that they were mistaken
00:19:52
during the investigation, we did not meet
00:19:54
anyone, he agreed that he 9700
00:19:59
kilopascals could be due to
00:20:01
something - something like the maguro bubble effect there are
00:20:06
cases of manifestation of such an effect but
00:20:08
usually they are smaller and it did not
00:20:11
seem to us a plausible explanation
00:20:16
of the file they are definitely mistaken but what
00:20:20
exactly prompted them to
00:20:23
make this mistake I just don’t know
00:20:26
this mistake cost Jason Anderson and 10 of
00:20:29
his colleagues their lives
00:20:46
oil industry veteran Professor Bob
00:20:49
Beat investigated 30 incidents at sea
00:20:51
he is an expert in the field of
00:20:53
human factors in disasters and has
00:20:56
thoroughly studied the circumstances
00:20:57
of the deepwater horizon disaster
00:20:59
his vocal cords were damaged by
00:21:01
toxins while investigating the collapse of a dam
00:21:04
in New Orleans
00:21:05
due to Hurricane Katrina was they did not want
00:21:11
blow up the system they didn't want to die he died
00:21:14
so there must be an explanation for that
00:21:17
remember how they did it forge mine
00:21:23
often we only imagine things not as
00:21:25
they are we believe they should be
00:21:29
fhd if we want everything to be in
00:21:32
order we will look for any adventures of
00:21:35
ours points of view did not find any
00:21:39
plausible explanation for the drop in
00:21:41
pressure of the drill string
00:21:42
because they wanted it to have a
00:21:46
simple and logical explanation knife and
00:21:49
towers and sample points to mind, the
00:21:55
drilling team missed the first chance
00:21:58
to understand that the well could break through
00:22:01
this and so the disaster could have been
00:22:03
prevented there was a serious mistake,
00:22:06
but not fatal, the
00:22:15
investigators know that the drillers decided to
00:22:18
carry out the pressure testing procedure of the well
00:22:20
again, giving themselves a second chance to get rid of
00:22:22
the problems,
00:22:26
this time they assessed the pressure through the well
00:22:28
killing line, a small pipe
00:22:30
connecting the platform to the well,
00:22:35
they opened no no and they
00:22:37
saw 30 minutes
00:22:38
but there was no which allowed us to assume that the
00:22:41
pressure in the well was not increasing. Jason
00:22:46
Anderson was sure that oil and
00:22:48
gas leaks were not
00:22:50
the head of the drilling british petroleum
00:22:52
agreed three hours after the start of the
00:22:55
first test, he gave the go-ahead
00:23:04
to the data showing that the pressure in the
00:23:06
drill column at that time remained
00:23:08
at around 9600 k. they didn’t have time,
00:23:11
by analogy with two straws in the
00:23:14
pressure glass of the drill string and the
00:23:16
kill line, it should have been the same, it’s a
00:23:19
valve in one part of the pipe, we see 9,700
00:23:23
rubles in the other, so I want to be, it shouldn’t be
00:23:30
young from the only explanation from my
00:23:32
point of view can for him what for
00:23:35
what - the reason the line was no longer
00:23:37
clogged drunk Lagos, perhaps a foreign
00:23:39
body from the well or lettuce shape, we don’t
00:23:42
know the staff made a conclusion
00:23:47
based on incorrect
00:23:49
instrument readings and neglecting the correct ones,
00:23:52
they did not find out what caused
00:23:55
the ascent, they missed a second chance to understand
00:23:57
that the well is not airtight, a second chance
00:24:00
to prevent a breakthrough
00:24:09
the well,
00:24:10
only it simply wasn’t plugged
00:24:13
if the transaction staff had correctly
00:24:16
interpreted the results of the pressure
00:24:17
testing procedure, it would have become clear at this
00:24:20
stage, it was still possible to shut off the well
00:24:23
at the bottom level and prevent a breakthrough,
00:24:26
this was not done and people paid
00:24:28
for their lives and this is not a drill
00:24:34
now investigators have to understand
00:24:36
why the well was not plugged
00:24:42
Richard Severs found out that the last
00:24:44
equipment the well was installed
00:24:46
outside the ring of disasters on 19
00:24:50
2010 when drilling wells at the lining
00:24:53
the comfort of steel pipes
00:24:59
as soon as the last piece of pipe is placed in the well,
00:25:01
concrete solution is pumped into it,
00:25:06
it passes through the hole and fills the
00:25:07
space Between the casing pipe and the
00:25:09
walls of the well, the hardening
00:25:12
concrete seals the well and prevents
00:25:14
oil and gas from escaping
00:25:17
such burning radiant moment is
00:25:20
that concrete or your wife fill this
00:25:23
annular space around the end of
00:25:26
the pipe with a length of head and kilometers from the
00:25:30
platform to the bottom of the well, evenly
00:25:32
still need to be pumped solution through the pipe
00:25:35
so that it comes out -
00:25:36
this in itself is very very
00:25:39
unpredictable;
00:25:42
at one of the most critical and
00:25:44
difficult stages of drilling a well, people
00:25:47
have to work blindly;
00:25:51
it is important to make sure that the last steel
00:25:54
pipe, the casing pipe, is located
00:25:57
strictly in the center;
00:25:59
if it moves, the solution around it will
00:26:04
remain unevenly distributed. the channel through which oil and gas
00:26:06
will enter the wellbore
00:26:08
the tip is installed using
00:26:11
centralizers they ensure uniform
00:26:13
distribution of the solution we had the
00:26:16
number of centralizers according to their exact
00:26:19
location is selected individually
00:26:20
for each well freeflow
00:26:25
learned there are no clear instructions as to
00:26:28
how many of them are required and there should be
00:26:32
enough to the
00:26:35
casing was well centered
00:26:38
for richard heart the main question was
00:26:41
whether enough centralizer had been installed
00:26:50
[music]
00:26:57
critical decisions about the well were
00:27:00
sometimes made seven hundred kilometers
00:27:01
from the platform in houston where
00:27:04
british petroleum's engineering team is based, including the
00:27:09
company's concrete mortar specialists and liberton
00:27:12
halliburton engineer jesse Galleana
00:27:14
worked in Beppe's office on April 15, 2010,
00:27:21
three days before installing the tip,
00:27:23
Galliano selected the required number of
00:27:25
centralizers
00:27:30
on the drilling platform, there were 6, but he
00:27:33
comes to the conclusion that this number is
00:27:35
not enough,
00:27:37
he recommends using 21
00:27:42
[music]
00:27:44
in the absence of the boss, the bit worker
00:27:46
takes responsibility order
00:27:48
delivery of another 15
00:27:59
the next day his boss
00:28:01
team leader british petroleum
00:28:03
jong this overrides his decision the new
00:28:09
centralizers are different in design he
00:28:11
is worried they might get stuck on the
00:28:13
way to one well
00:28:14
this could cause him to be way
00:28:16
behind schedule
00:28:24
richard seus reviews
00:28:26
emails between team members
00:28:28
Beppe engineers it
00:28:31
is important that in the correspondence between the
00:28:33
drilling mainland there were
00:28:35
recommendations for using a certain
00:28:37
number of centralizers up to 21
00:28:40
but in the end only 6 were used
00:28:43
British Petroleum engineers decide how to
00:28:49
arrange 6 centralizers one writes a
00:28:53
straight section of pipe even if
00:28:55
the tension does not take a perfectly
00:28:57
central position without
00:28:58
additional devices,
00:29:03
but what difference does it make, it’s done, everything will most likely
00:29:06
work out and we will have a good
00:29:08
concrete plug,
00:29:13
he says that John Guide’s decision was
00:29:15
correct, that in his opinion, the risk
00:29:17
of having to repair the plug is better than the risk of the
00:29:19
centralizers getting stuck in the well, no one
00:29:25
notes the increased danger of a well breakthrough
00:29:28
[music ]
00:29:34
too few centralizers may
00:29:37
have served as the starting point on the path to
00:29:38
the disaster,
00:29:39
but investigators cannot do this
00:29:42
because if the casing pipe is skewed, the
00:29:45
evidence is forever buried five and a
00:29:47
half kilometers below the surface of the
00:29:49
sea,
00:29:52
but there are a number of other circumstances
00:29:55
that can be investigated by the investigator,
00:29:58
it is necessary to establish whether the use was consistent
00:29:59
with
00:30:01
we
00:30:04
know for sure that the hydrocarbons
00:30:07
from this well reached the surface
00:30:09
were due to unforeseen circumstances,
00:30:11
which convincingly indicates
00:30:13
that the cement plug at the wellhead did
00:30:15
not fulfill its function and did not retain
00:30:19
oil and gas inside
00:30:20
the field as it should have been
00:30:26
For each well, a solution of a
00:30:29
unique composition is created; it is a complex mixture of
00:30:31
cement and chemical additives; its beat; the
00:30:36
key criteria for choosing a
00:30:38
solution are the reliability of the solution itself;
00:30:41
that it hardens properly and
00:30:44
has sufficient strength and
00:30:47
the necessary characteristics to
00:30:49
withstand the
00:30:50
pressure applied to it; investigators
00:30:57
study the one developed by the company or
00:30:59
Burton for the well. concrete recipe how
00:31:02
about easy flo
00:31:03
diploma look at the wellbore
00:31:07
was fragile and the concrete had to be
00:31:09
light and the child on becky came to an
00:31:12
agreement regarding nitriding
00:31:14
introducing dispersed nitrogen bubbles to
00:31:16
form foam concrete a controversial
00:31:19
decision with which the owners of the well of the
00:31:21
transaction company did not agree they
00:31:23
believed that nitriding concrete will not be
00:31:25
stable at such a depth
00:31:30
beppi ignored this objection
00:31:32
to this anti more complex concreting
00:31:35
fido if you do not maintain a stable
00:31:37
foam the bubble is supposed to burst that
00:31:39
in fact you can circle such a
00:31:41
formation of large power or even a
00:31:44
channel 1 class any of these phenomena
00:31:53
will lead to a disaster oil and gas
00:31:54
will break through their way into the well and will be
00:31:57
released uncontrollably to the
00:31:59
surface the
00:32:08
halliburton company has a laboratory
00:32:11
for testing concrete in louisiana
00:32:14
february 2010 pilot
00:32:18
testing of enchanted foam concrete is underway
00:32:21
one of the experiments shows that it is not
00:32:24
stable
00:32:25
nitrogen is released to the test strips bubbles
00:32:28
until investigators discovered that x liberton did
00:32:32
not report urgently about this
00:32:34
result british petroleum
00:32:39
two months later hal burton improves the
00:32:42
formula of the solution and conducts a series of more
00:32:44
tests this time on concrete and additives
00:32:47
obtained from the platform experiments
00:32:51
show that gas is still
00:32:52
released and it is very unstable
00:32:56
no one reports this to british petroleum
00:33:01
definitely not the
00:33:04
day before using the solution
00:33:06
in the well halliburton conducts new
00:33:08
tests this time mixing
00:33:10
the solution for a longer time
00:33:14
they make a statement that it works the
00:33:16
solution is stable by the investigator the necessary
00:33:19
evidence they test the
00:33:21
solutions themselves come to the opposite
00:33:23
revelation it was discovered that at
00:33:26
different heights the density is different if
00:33:30
the fact is that the concrete solution itself is
00:33:32
unstable, that it settles into a sediment, a
00:33:36
solid phase falls out, this indicates
00:33:39
that not everything is in order with the solution and that
00:33:41
it cannot be used in addition,
00:33:47
but this is exactly the recipe that the
00:33:50
companies and liberton used for
00:33:52
wells
00:34:08
36 hours after well the drilling platform began to break through,
00:34:13
the pipe connecting to the well sank and was dented
00:34:16
and transferred
00:34:19
within 86 days, crude oil flowed
00:34:23
directly into the Gulf of Mexico, an
00:34:26
oil spill estimated at 5
00:34:29
million barrels
00:34:30
led to environmental and economic
00:34:32
disaster throughout the US
00:34:34
Gulf Coast
00:34:41
only when relief
00:34:43
wells were drilled. Macondo was able to
00:34:45
finally shut down the flow was
00:34:47
stopped, the researchers were able to
00:34:50
begin to solve the final mystery of
00:34:52
why the emergency disconnection did not work
00:34:58
safety equipment in the most
00:35:00
critical situations is located under the
00:35:03
platform
00:35:04
anti-blowout preventer or pvp
00:35:07
similar to a giant crane over 16 meters
00:35:10
in height under normal conditions while
00:35:13
the well is in during
00:35:14
construction, personnel use
00:35:16
valves to control the flow of
00:35:18
fluid into and out of the well
00:35:20
but pvp can also perform an
00:35:23
emergency function designed
00:35:26
to prevent blowouts it should be
00:35:29
noted that there was an uncontrolled
00:35:31
flow of oil and gas to the surface so
00:35:33
obviously pvp you did not block us
00:35:38
the well ate been there
00:35:41
when the platform's emergency release system is turned on,
00:35:46
special steel
00:35:48
clamps slam inside the blowout preventer, which chop off the drill string
00:35:51
and kill the wells, then
00:35:56
the blowout preventer opens
00:35:59
the clamps, allowing the platform to escape.
00:36:07
Investigators believe that Chris
00:36:09
Pleasant's attempts to activate the emergency
00:36:11
release systems failed due to the fact
00:36:13
that the cables connecting the platforms to the pvp
00:36:15
at that time were already damaged by the
00:36:18
explosion, but the blowout preventer
00:36:22
is designed in such a way that this could not
00:36:25
disable them, but in the event of an accident on the
00:36:28
platform, they have a fail-safe
00:36:30
ghoul mechanism, if the connection
00:36:35
between the platform and the pvp ghoul is lost, they are powered
00:36:37
by a battery and should automatically
00:36:39
close the clamps, but as
00:36:44
investigators discovered one the voltage from the batteries
00:36:47
should not have been 27
00:36:50
volts, but in fact 7.6 is not enough to
00:36:54
power the vertical
00:36:59
trans, and he states that at the time of
00:37:02
the explosion the battery was charged and
00:37:04
only later there was no way
00:37:07
to find out how everything was; in fact, there
00:37:13
were also attempts to lead In the
00:37:15
clamping action from the outside with the help of remotely
00:37:18
controlled devices, oil
00:37:21
continued to flow out despite being operational under
00:37:25
normal conditions, the blowout
00:37:27
preventer was unable to cope with the pressure of the
00:37:29
leaking oil after the well broke out
00:37:32
about the bob. This is not surprising. The
00:37:37
damning evidence in the investigation
00:37:39
carried out by the industry regulator in
00:37:42
2002 was generally ignored by those
00:37:43
working in Gulf of Mexico
00:37:45
companies have it I you conducted a
00:37:48
full-scale test on these vb
00:37:51
including the 2001 model Cameron
00:37:54
used on the deep water horizon
00:37:57
and half of them failed
00:38:00
the assembly of the pipe
00:38:02
center half other countries said
00:38:06
that this is not acceptable but what are we doing
00:38:09
we continue to hope for the fact that the clamp
00:38:12
worked and hope is not the best
00:38:15
survival strategy after a six-month thorough
00:38:22
investigation, the national commission
00:38:24
revealed errors that led to a
00:38:26
catastrophic fish accident on the
00:38:28
deepwater horizon drilling platform, the main
00:38:31
reason was that the concrete plug
00:38:34
did not seal the well,
00:38:37
but there were also many other
00:38:39
shortcomings going back to the management of the
00:38:42
involved companies as well as many
00:38:45
opportunities to prevent a disaster
00:38:50
two days before the disaster
00:38:52
the casing was lowered into the well
00:38:54
with only six centralizers my which is 15 better
00:38:59
than the specialist recommended by them and
00:39:00
liberton
00:39:02
this decision baby made in houston
00:39:05
increased the risk of channel formation from
00:39:07
concrete
00:39:08
one day before the disaster or burton
00:39:12
ovsky unstable nitriding
00:39:15
concrete solution is pumped into the well
00:39:17
to secure the casing pipe,
00:39:20
not the bit employees, not the drilling rig personnel, do
00:39:23
not know how many unsuccessful tests
00:39:25
this solution has had 3:49 before
00:39:30
the disaster,
00:39:32
the tests show that the pressure in the
00:39:35
well is growing, one of the
00:39:37
drilling rig employees believes that the concreting was
00:39:39
unsuccessful and that the well is leaking another
00:39:44
convinces people that these are incorrect
00:39:46
instrument readings, if the
00:39:50
trans employees had already closed the valves at this
00:39:52
stage before the release began, they
00:39:55
would have still had time to plug the well and
00:39:57
avoid a disaster 1:54 before the disaster,
00:40:01
having repeated the pressure
00:40:02
testing procedure, the bureau employees
00:40:04
decide that the concreting was successful
00:40:06
and the well is sealed
00:40:08
they are not aware of the fact that the
00:40:11
well killing line is noticeable
00:40:13
cannot serve as a source of information about
00:40:15
pressure they are not trying to find the reasons for the
00:40:19
discrepancy the readings are not
00:40:21
blocked your eyes are empty another
00:40:22
opportunity to prevent a breakthrough 9 minutes
00:40:25
before the disaster
00:40:26
the well is broken through by gas and oil
00:40:29
the road through insufficiently strong
00:40:32
concrete,
00:40:34
now the team is trying to plug
00:40:36
the well, but the oil under colossal
00:40:37
pressure breaks through the blowout
00:40:40
prevent a
00:40:41
raid here and can no longer be eclipsed by the
00:40:46
highly flammable methane bursting
00:40:48
out of the well and enveloping the platform
00:40:52
when it reaches the engine room,
00:40:55
on its way it meets from
00:41:14
[music]
00:41:26
investigators sums it up, both Bibi and
00:41:29
the caliber transaction made a decision
00:41:32
unilaterally,
00:41:33
which increased the chances of a
00:41:36
Macondo well breaking through to them, each of these decisions
00:41:42
individually is well
00:41:44
justified by Vanya, if we consider them
00:41:48
together, they allowed the
00:41:51
incidents to happen, savored the bar and there was no one
00:41:54
who had a common picture of
00:41:55
what was happening and would have seen the system as a
00:41:58
whole, the people who died that night and a
00:42:01
full understanding of
00:42:03
how complex the entire system is, the
00:42:13
investigators pointed to it as the efficiency of
00:42:15
information transfer between three large
00:42:17
companies as a factor that
00:42:20
contributed to what happened
00:42:22
deep water horizon there was a problem with
00:42:24
communications Every step of the way,
00:42:26
both on the platform and on the motherboard,
00:42:28
communication is the main explanation for what
00:42:30
caused
00:42:32
[music]
00:42:40
they wonder whether the speed and
00:42:43
profitability were affected by the factors that
00:42:45
distracted people's attention from the
00:42:48
extreme dangers they had to
00:42:50
deal with when deciding to
00:42:52
use only 6 centralizers
00:42:54
leader Beppe well group
00:42:56
John Hyde noted that installing an
00:42:58
additional 15 will require an extra
00:43:01
ten hours, this is not cheap because the work of a
00:43:03
drilling platform costs about a
00:43:05
million dollars in this business there are
00:43:09
a lot of factors that force you
00:43:11
to save time and money not to
00:43:13
delay there must be something that
00:43:16
will balance this pressure what -the
00:43:19
criteria for safe broadcasting of safe
00:43:21
work
00:43:22
to ensure balance, the depo the
00:43:25
horizon team was spurred on by the fact that the lag
00:43:27
behind the schedule was 40 3 days
00:43:32
and what I call this is motivation of the lowest
00:43:35
order, you feel that the deadlines are
00:43:38
running out and you begin to rush
00:43:40
forms for the budget for this well
00:43:43
the amount was set aside at 96 million dollars
00:43:47
but today this drilling has already cost
00:43:50
somewhere insert ten here for this is a
00:43:55
huge pile of money to even imagine
00:44:05
the transaction believes that the blame mainly
00:44:08
lies with Beppe
00:44:10
Gillebird he claims that the pi and did not
00:44:13
provide them with sufficient information
00:44:15
regarding the well baby
00:44:17
admitted some mistakes, but he believes that
00:44:20
he or Burton is also partly
00:44:22
to blame Aronson
00:44:26
and will begin to assert that this cannot
00:44:28
happen again, of course it can, because
00:44:30
no one has canceled the risk, there is no way to reduce
00:44:34
the risks of August, but this industry must
00:44:37
do everything possible so that this does not
00:44:40
happen again,
00:44:44
the program has been announced Studio Ark ticket
00:44:46
text read by Alexander G

Description:

Катастрофа , произошедшая 20 апреля 2010 года в 80 километрах от побережья штата Луизиана в Мексиканском заливе на нефтяной платформе "Глубоководный горизонт" Последовавший после аварии разлив нефти стал крупнейшим в истории США и превратил аварию в одну из крупнейших техногенных катастроф по негативному влиянию на экологическую обстановку.

Preparing download options

popular icon
Popular
hd icon
HD video
audio icon
Only sound
total icon
All
* — If the video is playing in a new tab, go to it, then right-click on the video and select "Save video as..."
** — Link intended for online playback in specialized players

Questions about downloading video

mobile menu iconHow can I download "Секунды до катастрофы: Глубоководный горизонт. HD" video?mobile menu icon

  • http://unidownloader.com/ website is the best way to download a video or a separate audio track if you want to do without installing programs and extensions.

  • The UDL Helper extension is a convenient button that is seamlessly integrated into YouTube, Instagram and OK.ru sites for fast content download.

  • UDL Client program (for Windows) is the most powerful solution that supports more than 900 websites, social networks and video hosting sites, as well as any video quality that is available in the source.

  • UDL Lite is a really convenient way to access a website from your mobile device. With its help, you can easily download videos directly to your smartphone.

mobile menu iconWhich format of "Секунды до катастрофы: Глубоководный горизонт. HD" video should I choose?mobile menu icon

  • The best quality formats are FullHD (1080p), 2K (1440p), 4K (2160p) and 8K (4320p). The higher the resolution of your screen, the higher the video quality should be. However, there are other factors to consider: download speed, amount of free space, and device performance during playback.

mobile menu iconWhy does my computer freeze when loading a "Секунды до катастрофы: Глубоководный горизонт. HD" video?mobile menu icon

  • The browser/computer should not freeze completely! If this happens, please report it with a link to the video. Sometimes videos cannot be downloaded directly in a suitable format, so we have added the ability to convert the file to the desired format. In some cases, this process may actively use computer resources.

mobile menu iconHow can I download "Секунды до катастрофы: Глубоководный горизонт. HD" video to my phone?mobile menu icon

  • You can download a video to your smartphone using the website or the PWA application UDL Lite. It is also possible to send a download link via QR code using the UDL Helper extension.

mobile menu iconHow can I download an audio track (music) to MP3 "Секунды до катастрофы: Глубоководный горизонт. HD"?mobile menu icon

  • The most convenient way is to use the UDL Client program, which supports converting video to MP3 format. In some cases, MP3 can also be downloaded through the UDL Helper extension.

mobile menu iconHow can I save a frame from a video "Секунды до катастрофы: Глубоководный горизонт. HD"?mobile menu icon

  • This feature is available in the UDL Helper extension. Make sure that "Show the video snapshot button" is checked in the settings. A camera icon should appear in the lower right corner of the player to the left of the "Settings" icon. When you click on it, the current frame from the video will be saved to your computer in JPEG format.

mobile menu iconWhat's the price of all this stuff?mobile menu icon

  • It costs nothing. Our services are absolutely free for all users. There are no PRO subscriptions, no restrictions on the number or maximum length of downloaded videos.