background top icon
background center wave icon
background filled rhombus icon
background two lines icon
background stroke rhombus icon

Download "CURSO DE PROJECT 2021"

input logo icon
Video tags
|

Video tags

educación
enseñanza
aprendizaje
videotutoriales
instrucción
video tutoriales
curso
tutorial
video
microsoft
microsoft project
project
ms project
office
project2021
Subtitles
|

Subtitles

subtitles menu arrow
  • ruRussian
Download
00:00:00
[Music]
00:00:09
welcome to this Microsoft
00:00:12
Project course, this belongs to Microsoft's office automation
00:00:14
in its different versions,
00:00:17
for example, if we
00:00:20
observe the different versions,
00:00:22
we will be able to see that this last one
00:00:26
of the 2021 was previously the 2019,
00:00:30
then the 2016 2013 2010 So
00:00:35
on, the previous versions,
00:00:37
of course, there are versions before
00:00:38
2010, the interface was very different,
00:00:42
since approximately 2010, the
00:00:45
interface is very similar and even these
00:00:48
last three versions are practically
00:00:51
similar, of course, of course, as
00:00:54
the new
00:00:55
functionalities increase, the They are incorporating
00:00:58
these versions, there would also be versions
00:01:00
here which would be a
00:01:04
constantly updated parallel version of Office365,
00:01:07
so when we are going to talk about what
00:01:10
office automation is, we always have to
00:01:13
take into account these
00:01:15
official versions, for example, Word
00:01:17
2017 2018 or Excel does not exist. 2020 or project 2000
00:01:25
here in this case 2014 or 2015 so
00:01:29
with those clarifications we would now be
00:01:31
taking the project this latest or
00:01:33
recent version 2021 for desktop
00:01:39
project allows us to carry out different
00:01:41
types of activities in planning
00:01:44
we would be seeing the tasks the
00:01:47
elements such as the products
00:01:50
or services or all the resources that those
00:01:53
in charge of the project will need,
00:01:56
everything related precisely to the
00:01:59
realization through
00:02:00
generally the gang diagram which
00:02:04
will enable us to base it and
00:02:06
will see a dependency on the tasks or
00:02:09
independent tasks, milestones, everything. That
00:02:13
will make it incredibly easier for us to carry out
00:02:15
work and even if we had a
00:02:18
Microsoft game or if we had
00:02:21
hired a cloud specifically to
00:02:24
work on, then it will be much
00:02:26
easier to follow up on the projects.
00:02:29
It should be noted that we are going to
00:02:32
emphasize on this occasion
00:02:35
the applied program. especially for
00:02:39
the project but focused on the program
00:02:42
itself, this means that we are going to
00:02:45
be here looking at it, we are going to precisely
00:02:49
analyze all the options that
00:02:51
we would have, we are going to look at it one by one,
00:02:54
we are not going to focus exclusively on
00:02:56
the project but on the functionalities
00:02:58
to work on the projects we have
00:03:02
another course very similar to the
00:03:05
previous version but that is already focused on the
00:03:07
project the configuration that we should
00:03:09
make from this beginning this logically
00:03:11
jumps from areas to areas according to
00:03:16
the needs and according to the project but
00:03:18
in this case we here we are going to see on
00:03:22
youtube.com
00:03:23
and jone and gallardo we are going to look
00:03:28
precisely for the project here we
00:03:32
are going to look for it we would have it here the
00:03:36
office automation one would also
00:03:38
spend the the project in 2019 this
00:03:42
would be focused more on what
00:03:45
the project corresponds to that is why we said
00:03:47
We are going to jump from side to side, that
00:03:50
is, depending on what we
00:03:52
need, we are going to look for
00:03:55
different options to carry out
00:03:57
a project, but nevertheless, this cost
00:03:59
that we are making now we are going to
00:04:01
focus only on the
00:04:03
main options. in the project as such and
00:04:07
how we are going to add at the
00:04:09
beginning the tasks organize dates
00:04:12
resources all that but within what
00:04:15
fits that is, for example we are going to see task
00:04:18
all these options resources all their
00:04:21
options reports similarly
00:04:23
project and view all that based in the
00:04:28
nga diagram then it is
00:04:31
clarifications we are going to start this course
00:04:34
we are going to see now the part of the file
00:04:37
related to welcome
00:04:40
when we generally just open the
00:04:43
program we are going to see the
00:04:46
following interface appears we will have here
00:04:49
new start and open as well as
00:04:52
comments account and options then let's not
00:04:54
forget new start and open if
00:04:57
a new project is created and I come
00:04:59
through file here to the file part
00:05:01
then we would have new start open
00:05:04
the same thing that we just mentioned at the
00:05:06
bottom account comments and
00:05:09
options so it is similar
00:05:11
only that these
00:05:14
new options have been added therefore at the beginning
00:05:17
we would have here a blank project
00:05:20
we would start from this 0 our project
00:05:23
then we could from an
00:05:26
already existing project start a new project
00:05:29
this if we already have a
00:05:32
previous one and have created a project
00:05:34
we could start in the part here we
00:05:37
see a series of options for the
00:05:39
recently used
00:05:41
giancarlos pinned elements that we want to
00:05:43
be constantly present
00:05:45
how we generally do to pin
00:05:48
for example this create a
00:05:49
business plan I can click on this
00:05:51
small option here it would already be pinned and
00:05:55
when I click I open it therefore if I
00:05:59
come to start pinned we see that one would already
00:06:01
be I cannot unpin also
00:06:03
by clicking on it I come to
00:06:06
recent and again I would start another
00:06:09
project very well I can open
00:06:13
existing ones as we just said or
00:06:15
create one totally blank if I want to
00:06:18
start from some templates pre-made
00:06:20
by Microsoft itself in the same
00:06:23
office automation well I can do it here it says
00:06:25
more templates apply more templates it
00:06:28
will take me to new I'm going to click
00:06:31
we see that it has taken me to new the new one
00:06:35
we would have in the same option
00:06:38
blank project and these templates here
00:06:41
these are some that we have used since
00:06:43
there would be the templates by
00:06:45
categories for the projects because you
00:06:48
cannot go back here we would have for
00:06:51
programming analysis for sectors
00:06:54
company technology and marketing if
00:06:56
I already know the name I can look for it
00:06:58
directly here instead of creating a
00:07:01
blank project I click we see that
00:07:03
this would be the blank project
00:07:05
so here I would already have the
00:07:07
gang diagram and then we will see to
00:07:10
schedule tasks and here the progress in
00:07:12
calendar type dates so I am going to
00:07:15
come and I'm going to close it the other one I'll also
00:07:18
come and I'm going to close it
00:07:20
now we would have a blank project
00:07:23
so if I say new it can be a
00:07:26
blank one or a template for example if
00:07:29
I say here something like create a budget
00:07:33
or in projects I'm going to simply say
00:07:36
a simple project I click and it opens
00:07:40
this option and it tells me when
00:07:45
the project will start, I will say this
00:07:48
today, this date and I say create and now it
00:07:52
has created a project for me, so
00:07:55
from this project I'm already starting to edit and
00:07:58
also to know how it works,
00:08:01
then that would be to open a
00:08:05
template or a completely blank one.
00:08:08
Opening is simply going to our
00:08:10
computer or our cloud in this case
00:08:13
andratx to open a document
00:08:16
related to project or it can be on
00:08:19
this computer this pc is the same as
00:08:22
examining this pc takes me to my
00:08:24
documents on my computer
00:08:27
examining takes me to all my files
00:08:30
including here documents these are my
00:08:33
documents has taken me to the same place
00:08:35
as here on this pc to examine but if I I do
00:08:40
n't want to save in my documents
00:08:41
I want to save somewhere else so
00:08:42
I can say examine
00:08:44
I come and look here where my project would be
00:08:48
and there I would just start to
00:08:51
open it so let's see I'm going to come
00:08:55
to the examine part on the desktop
00:08:59
I have here project one I click and I say
00:09:02
open now, the project has opened,
00:09:05
one very good, I'm going to close it,
00:09:09
this I'm also going to close it, I'm not going to
00:09:12
save it and I'm going to stay with the
00:09:13
project blank, very good, so
00:09:16
to open it can be highlighted or from my
00:09:19
cloud if I had it saved in my cloud
00:09:22
something related to project that is, the
00:09:25
established format I will be able to open it
00:09:28
then we would have here much more I will
00:09:31
make a simple change here I
00:09:34
will simply put it manual task 1
00:09:39
duration 10 days it
00:09:42
will start today
00:09:44
enough so now when I come
00:09:48
to information
00:09:50
I am going to have project accounts here on the
00:09:53
web, we are not going to use this because we
00:09:55
want a joint project, it
00:09:58
is always related to the cloud, that is,
00:10:00
a work between several people, here
00:10:03
I would have the project information
00:10:05
end date project from
00:10:08
the beginning of today current date
00:10:11
status date the calendar that is being
00:10:14
used we could change the calendar
00:10:16
later we will see how to create
00:10:18
our own calendar and the priority
00:10:21
of the degree of importance here it would have to
00:10:23
organize global template if I click
00:10:26
here it would be views reports modules
00:10:30
tables filters calendars that are
00:10:33
uses and many more options we are going to
00:10:37
understand this once we
00:10:39
start using the
00:10:42
sheen program we are going to start to see what
00:10:44
all of these are for but at this moment
00:10:46
no and we are not going to
00:10:49
specify it simply knowing that
00:10:51
we would have more options for our
00:10:53
project so as not to confuse them we are not going to
00:10:56
use it now I am going to save it
00:10:58
logically it allows me to save it with a
00:11:01
name when I click save
00:11:04
logically it is calling me to save
00:11:06
like because I have not yet saved for the
00:11:09
first time on this computer we have
00:11:11
said that it takes me to my documents I
00:11:14
prefer to say examine so I
00:11:17
could also save it in my cloud or
00:11:20
synchronize it so that we can work
00:11:23
together with several people from the
00:11:25
cloud so I'm going to say examine I'm going to
00:11:28
work on my desktop computer
00:11:30
and I'm going to say project 2
00:11:34
if we look at the native format or
00:11:36
mpp extensions let's not forget that there are
00:11:40
other compatible formats such as
00:11:43
for example I can save it in pdf
00:11:45
also in excel files or in csb
00:11:49
this delimited by comma which is for
00:11:51
exporting pure data without format or
00:11:55
also very similarly it would be xml this is
00:11:59
also used for web pages
00:12:01
I'm going to leave it like this the native format would be
00:12:03
this project so mpp every time
00:12:06
we see a format like this we're going to
00:12:08
know that it's project so
00:12:11
I'm going to say save here at the
00:12:14
top in the title bar it tells me
00:12:16
project 2 mp so If I come now
00:12:20
I say here to make a change modification
00:12:24
for example here I am going to say manual here
00:12:27
task 2 I
00:12:30
am going to put a
00:12:32
few days kill from or I am going
00:12:38
to do it like this
00:12:40
a little more I
00:12:43
am going to delete this
00:12:47
right away we are going to see all these
00:12:50
and the predecessor would be this very well
00:12:53
then we already have the
00:12:55
second task organized I can now save the
00:12:58
changes that I just made in the
00:13:00
upper left press save or
00:13:03
also the keyboard shortcut combination
00:13:05
control g or come to file
00:13:08
equality in all three ways
00:13:11
Whichever one they are the same,
00:13:13
the project will always be saved, project 2. If I want to
00:13:17
save with another name, I come here to
00:13:19
save, as logically, I am going to
00:13:21
save the changes already made now
00:13:25
instead of project 2, so that it is called
00:13:26
project 3, it will leave the
00:13:30
project intact. 2 and I'm going to start working
00:13:32
on the project 3 file save as in
00:13:36
examine project 3 I
00:13:40
'm going to put it with a hyphen so you can
00:13:42
see the difference and I'm going to say here on
00:13:46
desktop and save if we see at the
00:13:49
top of the bar titles
00:13:51
we would already be with project 3 I am no longer
00:13:53
touching on 2 that is extremely important
00:13:56
to take into account so that is why it is to
00:13:58
save then print it tells me that
00:14:01
everything we have done here with some
00:14:04
details of the project with some
00:14:06
characteristics will be able to print
00:14:08
it The only thing I would have to do is choose
00:14:09
the printer already installed on my
00:14:13
computer and press print. It would be
00:14:16
advisable not to touch on the
00:14:19
sheet sizes and orientations because
00:14:22
we have configured something. Let's see how
00:14:24
we configure the sheet for printing. That
00:14:27
is extremely important because if
00:14:29
We change something and we modify
00:14:31
something, it will probably go out of the
00:14:33
margins so we will see
00:14:36
later how to make the
00:14:39
project printed according to the configuration
00:14:42
so now as it is configured
00:14:44
this is quite good so
00:14:46
simply print then in sharing
00:14:49
also in sharepoint we could
00:14:52
change it here and this would be when we have
00:14:55
indicated that we can work on the
00:14:57
same project several people from
00:15:00
different places or simply by
00:15:03
email I send it as an
00:15:05
attachment you can click the depending on the
00:15:08
email provider that
00:15:10
I am using in this case the outlook I am
00:15:12
using and here I directly say
00:15:14
to whom it is going to be sent, for example
00:15:16
for álex segovia and I say travel and
00:15:20
the project will be sent immediately
00:15:22
to where we have saved it, I am going to
00:15:25
say that I am not going to save the changes
00:15:27
so that is what sharing is for but if
00:15:30
we want do it the
00:15:32
traditional way we simply open our
00:15:34
email in a browser and
00:15:36
attach it to this project that is already
00:15:39
saved on the desktop but share just
00:15:41
in case much faster
00:15:43
we could make it
00:15:45
export it is the same as saving
00:15:48
for example in save like when I say
00:15:51
Examine here we would have the
00:15:55
different formats PDF we would have
00:16:20
and here
00:16:25
we would have what we just did
00:16:29
so we have exported it
00:16:32
here it is the same
00:16:35
export file and it tells me in a pdf what we
00:16:38
just did well we
00:16:40
can also do it from here or save the project
00:16:43
in other files the same thing that we just
00:16:45
saw also in save as in for
00:16:48
compatibility with other
00:16:51
project versions in excel
00:16:53
xml
00:16:55
another type of file and in fact
00:16:56
this export should not exist because in
00:17:00
any case in save as it would have the
00:17:02
same alternatives
00:17:04
so in any of the cases it does not matter
00:17:08
caesar is to close the current project
00:17:10
where we are working
00:17:12
on
00:17:29
top some
00:17:31
details that we could add here
00:17:35
so I'm going to leave any of
00:17:38
these and the color we could also
00:17:41
change here would be multicolor which is the
00:17:45
one we are using a dark gray
00:17:49
still a much darker black than the
00:17:51
previous one a white
00:17:55
is very very similar to multicolor, as
00:17:57
we see, white
00:18:00
simply highlights the
00:18:02
area where the space would be the background a little more or
00:18:06
uses the system configuration if
00:18:09
I change it. In this case I am using
00:18:11
Windows 11. If I change everything or Windows
00:18:16
to a dark color it
00:18:17
will automatically change. project,
00:18:19
like all Microsoft office automation,
00:18:21
such as word excel power point
00:18:24
vice, all of those are also going to change
00:18:27
color because here I am
00:18:28
saying use the system configuration
00:18:32
and in this case you can add here my cloud
00:18:35
would already be connected to my cloud then
00:18:38
so I'm also going to be able to save
00:18:39
when I say save as in my cloud and I
00:18:43
can actually click here save to
00:18:45
a custom folder and put it
00:18:48
just very well in comments
00:18:51
you can send comments to the creators
00:18:53
of this program or to the emails at least to
00:18:56
the administrators of this program
00:18:58
who would be in charge of Microsoft
00:19:01
of the tica firm I can say that I
00:19:04
like the features there is one
00:19:06
feature that I do not like I have no
00:19:08
suggestions to improve this program and
00:19:12
in options we have to be a little
00:19:14
careful we can just configure the
00:19:17
functionality of many of the things in
00:19:20
project, for example, what things are going to be
00:19:22
shown, how we make the symbol in this
00:19:25
case of money, the euro currency and it could
00:19:29
change to dollars, we are going
00:19:31
to see here, generally
00:19:34
another type of nomenclature is used, we are going to
00:19:37
leave it in euros.
00:19:39
or we could also use this USB
00:19:41
which would be more or less equivalent to a
00:19:44
dollar
00:19:45
also in programming here the type of
00:19:48
calendar is the Gregorian one in which we
00:19:50
generally use here programming
00:19:54
for some activities or automatisms
00:19:56
spelling and grammar checks
00:20:00
save every few
00:20:03
minutes automatically to not to
00:20:05
lose the project and where it will be
00:20:07
saved if I activate it on
00:20:10
current computers we would have a lot of ram memories
00:20:13
and all that so there is no problem if I
00:20:15
constantly forget to save I can
00:20:17
say every five minutes to automatically save it
00:20:19
here
00:20:21
later if it is cut the light turns
00:20:24
off my computer or something like that it goes away
00:20:26
you can recover this work very well
00:20:30
then the language would be Spanish I can
00:20:33
change here same language in advanced
00:20:36
many other options this one next we are going
00:20:39
to see the customization of the ribbon of
00:20:41
options that is in the top
00:20:42
left of the program
00:20:45
and this from the
00:20:47
quick access toolbar this is the
00:20:51
quick access from the top left and
00:20:53
this from all the tabs that
00:20:56
correspond to project this generally
00:20:59
from the ribbon of all
00:21:01
programs are very similar to
00:21:02
office automation and here I would have to activate and
00:21:05
deactivate many of them
00:21:08
later in add-ons and trust centers
00:21:10
I can leave all this as
00:21:12
it is if I simply say accept
00:21:14
very well if I come here let's say here more
00:21:18
commands we see that it takes me to the same
00:21:20
project options that we just saw
00:21:22
but to the
00:21:24
quick access toolbar that we are going to display soon, we are
00:21:27
now going to see the interface and here the
00:21:31
view tab that helps us configure
00:21:33
the interface, what things to see and what things we are not
00:21:36
going to see here In the first instance, what
00:21:39
is this program that we have
00:21:42
used in some way, Word Excel,
00:21:46
Powerpoint, that we have used
00:21:47
any of those, the interface is very
00:21:50
similar in terms of operation,
00:21:52
it means that we would have, on the one hand,
00:21:55
here at the top of the project
00:21:59
as it says three means the name of the
00:22:01
project on the left side the access
00:22:05
to quick tools everything that is
00:22:08
here I can configure it in this place for
00:22:10
example for a new project here
00:22:13
active new
00:22:15
and so to open a project here
00:22:17
we would have
00:22:19
then any of these we could
00:22:21
enable and if I still want more
00:22:23
apart from them here I am going to say that
00:22:26
if I go to save it here we would have more
00:22:32
commands and I click for example this
00:22:35
background color I can add here
00:22:38
the background color would be I say accept now we would
00:22:41
see background color if I want to remove
00:22:44
it I do the same action I come to this
00:22:48
small option more commands I come to
00:22:51
background color and I say remove now I say
00:22:55
to accept and when we have removed then
00:22:57
that's what the
00:22:59
quick access tool class is for and I can even put it
00:23:02
under the ribbon but
00:23:04
it is not occupying I prefer one more field
00:23:06
above where it is at the same level as the
00:23:09
title. I come here and say many more.
00:23:13
Then I would have the traditional ribbon
00:23:15
that we have indicated. It
00:23:17
works the same in any of the
00:23:19
Microsoft office programs through
00:23:21
tabs. Here I would have course assignments.
00:23:24
project reports and many more we are going to
00:23:28
see all of them so here it
00:23:32
is always visible if I want to hide it
00:23:34
here we would have at the bottom
00:23:36
right of the entire ribbon
00:23:38
this small option I click and it is
00:23:42
hidden to see it again in
00:23:45
any of the tabs I click
00:23:46
again it appears but if I click
00:23:49
on the work area again it
00:23:52
hides if I want it to be permanently
00:23:54
visible I also come to any of
00:23:56
the tabs the ribbon appears
00:23:59
and I anchor it again in this
00:24:01
place
00:24:02
now it would be permanently visible no matter how
00:24:05
much I do click outside it is still
00:24:07
visible
00:24:08
then as we said each of these
00:24:11
tabs has options according to its title
00:24:14
for example here the title is area all
00:24:17
this related to the tasks this the
00:24:20
management of resources to the reports to the
00:24:23
entire project in stay view everything
00:24:27
that we could see and improve the view in
00:24:30
our project in our
00:24:32
work area and help because comments
00:24:36
will take us previously in files
00:24:38
we have seen that we could have
00:24:40
comments here at the bottom is
00:24:44
very similar
00:24:46
or show learning some tricks or
00:24:49
help woke up some things in the
00:24:51
program we Arabs use this
00:24:53
then there are always some
00:24:57
contextual tools depending on what we
00:25:00
are using it will be activated
00:25:02
automatically
00:25:03
for example these generally
00:25:05
work using the galp diagram
00:25:07
but if I click here on this
00:25:10
time scale it is pipes to go through let's not forget
00:25:12
that we can here at the intersection
00:25:14
make a long click and drag or
00:25:19
here also
00:25:20
to the left or to the right
00:25:24
very well then here for example if
00:25:27
I click we see how the
00:25:29
contextual tab has changed and it already tells us
00:25:31
gang diagram if it doesn't say
00:25:34
time scale it I believe that the ga diagram
00:25:38
continued
00:25:39
to be used as a
00:25:42
task form, here we see that the
00:25:44
task form appears, so
00:25:47
the contextual tools will always appear, I
00:25:49
click on the timeline, I
00:25:52
return here to the gam diagram and here the
00:25:55
ga diagram very well So in that
00:25:58
way we would have to understand it, there is a
00:26:01
time scale that will tell us
00:26:03
that as we do
00:26:05
the work, they
00:26:07
put
00:26:10
all the tasks or phases in a systematic way in time, then at
00:26:14
the bottom we would have the
00:26:16
views here I click with the right button,
00:26:20
we would have to take out the different
00:26:22
calendar view views, for example,
00:26:24
we would have here the diagram of it, it
00:26:28
would also have more of a network,
00:26:31
this is to organize a kind
00:26:34
of tables from project to project from phase
00:26:38
to phase within the project, then
00:26:41
scale time what was at the
00:26:43
top we have brought it to all the
00:26:45
available space
00:26:47
task forms later we will
00:26:50
see when we are working on
00:26:52
tasks
00:26:53
here the big tracking is very
00:26:57
similar to the Ghana diagram here and
00:26:59
even in the it appears with that half
00:27:01
gas diagram let's see what I'm going to
00:27:03
click with the right button
00:27:05
gang diagram we see that it is very very similar and
00:27:08
then task sheet also the
00:27:11
pending tasks without that area that tells us
00:27:15
the dates of those in charge resources
00:27:19
all of that very well then we would have Using
00:27:23
tasks is also very similar to the
00:27:25
task view, very well, I'm going to return
00:27:28
the one that comes by default, it would be the
00:27:30
gas diagram, so it is a form of
00:27:32
visualization,
00:27:34
it is like we would have two windows more or
00:27:36
less open on the left and on the
00:27:38
right. The left
00:27:40
would be the tasks and on the right the
00:27:43
time that each of those tasks will take,
00:27:46
therefore I would have a
00:27:49
horizontal scroll here
00:27:50
and here on the right side a
00:27:53
horizontal scroll as well as a
00:27:56
vertical one for both the task area and
00:27:59
The dates
00:28:01
at the bottom are extremely
00:28:03
important. When we are
00:28:06
going to automatically start
00:28:07
entering the tasks, we need to
00:28:10
specify the way in which it will be
00:28:12
carried out. The task here can be
00:28:16
automatic or manual. The automatic one will be
00:28:20
organized according to the date and
00:28:22
calendar that we are going to
00:28:24
configure, however the manual one is not going to
00:28:27
be within the calendar area, we are
00:28:29
going to set some authoritative dates,
00:28:32
they would be like isolated tasks, so
00:28:35
most of the time we work in a
00:28:37
coordinated way, both automatically and manually
00:28:41
from this place we are going to start
00:28:43
inserting we are going to get more familiar with it
00:28:45
later when we add each
00:28:47
of the tasks
00:28:49
so at the bottom
00:28:51
we also have here different views this
00:28:53
is the gun diagram in fact if I come
00:28:56
to the view tab now we are going to
00:28:58
start to get familiar much better,
00:29:00
for example, here would be a diagram of a
00:29:02
which is the same as here in view of
00:29:04
pressing this vote then I would have here the
00:29:08
use of tasks at the bottom the
00:29:10
second option here I would also have the use
00:29:12
of tasks either of the two is
00:29:15
totally valid and let's go let's see the
00:29:16
tasks here and the corresponding days
00:29:21
then here we would have a third party we are going
00:29:25
to tell it to save it automatically and
00:29:28
in fact I am going to come here to options the
00:29:31
automatic saving I am going to deactivate it
00:29:34
here
00:29:37
in the saving part I am going to tell
00:29:40
it no
00:29:41
accept very well and now the second that
00:29:46
said use of tasks which is the same as
00:29:48
pressing here the third that that day
00:29:50
team organizer that will be pressed
00:29:53
here that is,
00:29:57
the manager,
00:29:58
administrator, the worker, the
00:30:03
area manager will show us the corresponding teams. things like that
00:30:06
fourth would be resource sheet which would be
00:30:08
how to click here all the resources
00:30:12
that we are going to use the last would be a
00:30:14
blank project very well then
00:30:18
from here we can have access to the
00:30:20
different views or from the
00:30:22
bottom we have the diagram here from
00:30:25
ghana task use
00:30:28
team organizer resource sheet any of
00:30:31
those would be at the bottom
00:30:33
we would also have other views
00:30:36
forms for example I'm going to open a
00:30:39
project or at least a template of an
00:30:42
existing project so I'm going to
00:30:45
say here in new project here I'm going to
00:30:49
tell us relatively complete to create a
00:30:52
business plan starting today and now
00:30:55
in view let's see that this is
00:30:57
practically already
00:30:59
visible very well all these
00:31:03
projects the phases
00:31:05
here the sub phases and the tasks then
00:31:09
all of that would already be done here and here
00:31:12
the dates of the same and who
00:31:15
would be in charge
00:31:17
then in the first case this
00:31:19
is the gang diagram that we would see and
00:31:21
here the time scale
00:31:24
then if I say use of tasks to spend
00:31:27
on the tasks and the hours in each of
00:31:30
the weeks of each of these then
00:31:33
we have said team organizer at the
00:31:36
bottom it would be here for example I
00:31:39
am going to make this a little bigger
00:31:45
very well there
00:31:48
here now if the business advisor the
00:31:51
administrator the accountant the
00:31:53
lawyer colleagues all of that would be here what
00:31:56
activities are going to be dedicated to at the
00:32:00
bottom we would also have this
00:32:01
zoom to get much closer
00:32:04
even if we don't see it like this now if this
00:32:07
is the zoom then in view here we have a
00:32:11
team organizer as well as the
00:32:14
resource sheet here all the resources
00:32:16
would be these here later we are going
00:32:20
to specify everything that we are now
00:32:22
indicating we simply want to know that
00:32:24
the views are available according to
00:32:26
our needs
00:32:27
later we are going to see the tasks the
00:32:31
teams resources reports projects all of
00:32:34
that so from this view I will be able to
00:32:38
focus no specifically something
00:32:41
if it returns gan diagram for example
00:32:43
I can sort the views here this data
00:32:47
by start date end date of
00:32:51
the tasks by priority of the tasks
00:32:54
by costs to be identified or there
00:32:58
could also be schemas here from level 1
00:33:00
these are level level 1 we
00:33:03
only see the headings
00:33:05
after level 2 there would be the sub
00:33:08
phases
00:33:09
after level 3 there would be the tasks
00:33:12
themselves and if we had more sub
00:33:14
levels
00:33:15
we could see all of those here so
00:33:18
I can say finish all the sub tasks
00:33:20
also here later in tasks we will
00:33:24
see How to give levels using these
00:33:26
options. At the moment we are interested in
00:33:28
knowing that from here we could order the
00:33:31
views or simply here customize
00:33:35
using input tables that are already there or
00:33:39
using summaries, costs, all of this
00:33:42
using tables,
00:33:44
then we could finish jumping, for
00:33:46
example, all of what we call milestones.
00:33:49
Later we are going to see what the milestones are,
00:33:50
then further down here the digits are highlighted I
00:33:54
am going to say it without highlighting
00:33:57
I could highlight
00:33:59
active tasks all of these and so on
00:34:03
all of this we could
00:34:05
highlight or filter what was seen I only
00:34:08
want to see nothing more than milestones here they are
00:34:11
all the milestones
00:34:14
in this case here I can say without filters let's
00:34:19
not forget that this
00:34:20
complete project is going to be organized in a single
00:34:22
window as we observe all these
00:34:25
activities all these tasks within
00:34:28
the corresponding area so here
00:34:32
we could also see the groups
00:34:35
zoom the same as We have zoomed in at the
00:34:37
bottom to get closer or
00:34:40
further away from this organization of the
00:34:43
schedules of times and resources,
00:34:46
then we would have a time scale in days,
00:34:50
it could be entire weeks as we are
00:34:53
seeing or an entire month here, so an entire
00:34:58
entire month we are seeing from there
00:35:01
and so on. successively as I go
00:35:03
down we see the entire month or as I
00:35:07
said or complete project all the
00:35:09
possible width of the window on the right side
00:35:13
or if I select this task for example
00:35:15
I can say that only the
00:35:17
selected tasks I want to see here in this area
00:35:20
2 so as not to having to constantly move
00:35:22
this from here the horizontal and
00:35:25
vertical scroll if I say complete project for
00:35:28
example here in researching the market
00:35:30
then I would have to zoom
00:35:34
and then go to the left to see where
00:35:37
I am and then remember a little this
00:35:40
horizontal and vertical scroll for that
00:35:43
I prefer the selected task to see everything
00:35:47
complete from what date to what date
00:35:49
here it could be for hours too or
00:35:53
for days whole days
00:35:57
this is a time scale that is still
00:35:58
seen at the top if we are going to
00:36:00
work with monitors that are quite wide
00:36:03
in terms of resolution For example, 2
00:36:06
every 4 every 8 here and even the new
00:36:10
16 monitors here that are for
00:36:13
advanced design, we could leave this, there is no
00:36:17
problem leaving it visible because it will not
00:36:20
take up much field, but if I am going to
00:36:22
work on a monitor or I have a
00:36:24
full monitor hd or hd or traditional
00:36:27
monitors can hide the
00:36:29
time scale it will no longer interrupt me because I
00:36:31
will not need to see it all the time
00:36:34
here we will be working on the tasks
00:36:36
in their respective schedule of dates and
00:36:39
resources
00:36:41
also in each of the tasks you can
00:36:43
access to them by double clicking
00:36:45
and here I could see all the details or
00:36:49
information of the task or here in
00:36:53
details at the bottom
00:36:55
all the details of
00:36:58
the task will also appear but it takes up quite a field
00:37:01
similar to the time scale so
00:37:04
We deactivate
00:37:05
then here in each of the tasks
00:37:08
we already know that to be able to see it
00:37:10
we could double click
00:37:13
or later we will see here in tasks
00:37:15
here we would have information about the task
00:37:18
the same as double clicking very well
00:37:21
so up to this part this is the
00:37:22
interface now We know that the ribbon
00:37:25
is at the top
00:37:26
using tabs, there is a tab
00:37:29
called view to organize everything that
00:37:32
we are going to see, if we do not want to get confused
00:37:34
or anything like that, we will leave it alone,
00:37:36
we would have to pay attention to every two
00:37:38
things, time scale, see and hide
00:37:41
details at the bottom see or
00:37:45
hide
00:37:46
these two the rest of us have said that
00:37:49
from the bottom you could access
00:37:51
the same options that we
00:37:53
would have here in the different
00:37:56
views mainly we are going to
00:37:58
focus here on this tasks in
00:38:01
diagram ga now we are going to see this from
00:38:05
the task tab probably what
00:38:07
we work the most and what we
00:38:10
are going to relate the most with would be the
00:38:12
tasks what it consists of we are going to
00:38:16
work with gang diagram is a
00:38:18
way in which we are going to see here the
00:38:20
progress of the tasks of a project and
00:38:24
we would have to
00:38:26
gradually add each of the tasks and
00:38:29
their respective phases,
00:38:32
then the task panel that is in the
00:38:34
first instance is due to the degree of
00:38:35
relevance it has, this is all what
00:38:38
we are going to do use
00:38:39
we are going to exemplify
00:38:42
all this first and then we are going to understand how it
00:38:46
works, for example
00:38:49
this time scale later we are going
00:38:51
to see it
00:38:53
so we said that we can hide it
00:38:56
then I am going to come into view and I am going
00:38:59
to hide it then again I'm going to
00:39:01
return to the task tab, each of
00:39:04
these is a task, the first, the
00:39:07
second, the third and so on,
00:39:09
on the left side we said that
00:39:11
the title would be vertically and we are going
00:39:14
to start putting each of the
00:39:17
things here then at the bottom
00:39:19
We have said that when we are going to add
00:39:21
each task,
00:39:23
the programming will be automatic or
00:39:25
manual,
00:39:26
as indicated by automatic programming,
00:39:28
calculating the dates of the tasks
00:39:31
automatically and integrating it into the
00:39:35
project as a whole, but
00:39:36
manual programming the tasks will not be
00:39:38
They update automatically, I would have to
00:39:41
start putting it one by one, for
00:39:44
example, here if I put a task,
00:39:47
first I have to select what
00:39:48
form it is going to be, if not I select, it will
00:39:50
go back to what is below, here it is the same
00:39:54
manual and automatic ak manual and
00:39:57
automatic then I'm simply going to
00:39:59
select yes, automatic selection,
00:40:02
then the next time here
00:40:04
the unsubscribes are going to be automatic without the
00:40:07
need for me to do anything, so
00:40:09
I put here, for example, the name of the task
00:40:11
and I say task 1
00:40:15
very well and it tells me how long it will
00:40:18
last. That title would be duration, I
00:40:20
'm going to say this task is going to last 5 days
00:40:24
and it tells me when it's going to start so I'm
00:40:27
going to say today's date and it
00:40:30
automatically calculates 5 days and I
00:40:34
no longer have to put the end date of
00:40:37
this task and He tells me before this task
00:40:41
another task is going to come, I tell him that no
00:40:43
here there are no predecessors
00:40:47
therefore there are no predecessors here to
00:40:50
any other previous task and in
00:40:52
resources we would not have resources
00:40:55
later we are going to manage the same and I
00:40:58
could add resources simply and
00:41:01
even we are going to see that there are different
00:41:03
resources
00:41:05
here we would have
00:41:09
much more detailed material and cost work resources
00:41:12
we are going to specify this for
00:41:15
example in work we are always
00:41:17
referring to
00:41:18
human resources and technical resources
00:41:21
human resources would be people for example
00:41:24
For the first task I would be using
00:41:27
here, for example, the civil engineer, as it
00:41:31
could be in the case of, for example,
00:41:33
programming or a web design or a
00:41:37
marketing project, then the
00:41:38
marketing manager, we
00:41:40
could add all of that here, very well,
00:41:43
let's continue then and In fact,
00:41:46
I could already add a resource
00:41:48
minimally at least so that it is
00:41:51
noticed there.
00:41:53
For example, José González, it is not
00:41:56
appropriate to put it from here, but
00:41:59
we only want it to be displayed in the
00:42:01
corresponding place and the cost could be
00:42:04
assignment. We are going to put it, accept,
00:42:07
so here we would have a
00:42:09
human resource that would be jose gonzalez
00:42:12
although I have added him from here we have
00:42:14
said by double clicking or right here in
00:42:17
tasks
00:42:19
we are in the tasks tab here
00:42:20
information give the same either of
00:42:22
the two by double clicking on the
00:42:24
task or clicking on information
00:42:26
here we would have predecessor general tabs there
00:42:29
are no resources we
00:42:32
just put this here if I come at
00:42:35
the bottom to the course sheet view it
00:42:37
has been added automatically and
00:42:41
even a series of them are missing
00:42:43
later when we are looking at
00:42:46
resources we are going to see them in detail very
00:42:49
well everything that interests us that day, let's
00:42:51
see this later when I write here
00:42:53
directly task 2
00:42:58
I can do tabulation with the
00:43:00
tab key it automatically goes to the
00:43:03
next one and I have not had to select
00:43:05
anything here because the bottom part of
00:43:07
said program automatically gives it
00:43:09
so here it also does In fact
00:43:13
we could even jump to the explanation
00:43:16
here to program this would be
00:43:20
automatically it is manual
00:43:23
if we look here is the
00:43:25
automatic symbol when I put it manual
00:43:28
the symbol has changed because I am in
00:43:30
task number 2 now it would be
00:43:33
manual programming I am going to leave it automatic very
00:43:36
good then it is here I will also be able
00:43:38
to change or highlight same I can change to
00:43:41
manual or automatic very good then I
00:43:45
am going to leave it here it tells me how many days it will
00:43:48
last it will last about 7 days
00:43:52
and the interesting start date in
00:43:56
the predecessors tells me that before
00:43:58
this task two I could designate the one
00:44:02
task that this task 1 is completed first
00:44:04
and then just start
00:44:07
task 2 or simultaneously it can start
00:44:12
like now we are fine and it has a
00:44:14
duration of 7 days
00:44:16
then it will start together with the
00:44:18
task 1
00:44:20
task 2 both will start
00:44:22
simultaneously and each one will finish
00:44:25
on its corresponding date this should
00:44:28
last 5 days and these 7 days
00:44:31
or otherwise I can say that when
00:44:35
the task finishes one will just start
00:44:38
task 2 so you always want now
00:44:40
I click on this little tab and I say
00:44:42
this is going to be the predecessor of
00:44:45
task 2. I click outside. Now we see
00:44:49
how I put it here with an arrow.
00:44:52
It means that after 1, task
00:44:56
2 begins. If I tell you that it doesn't have the
00:45:00
predecessor, but It can start on another
00:45:02
different date,
00:45:04
it can start, for example, on the 4th, so
00:45:07
let's see with more detail here,
00:45:10
the date is going to start on Friday the
00:45:15
first and on Monday the 4th, task 2 is going to start,
00:45:18
so it has a different
00:45:22
schedule and here it is clarifying the
00:45:24
same for me, so we see how In three ways
00:45:29
we have seen clearly that later we are going
00:45:32
to see this about the interrelation between the
00:45:35
elements but basically now
00:45:37
we would be seeing that when
00:45:39
one begins after the days
00:45:43
the next begins, task one is not related to
00:45:46
task two, each one is
00:45:49
independent very well. but generally
00:45:52
we try to relate it so I'm going
00:45:56
to say it here when I finish 1 start
00:46:00
2 I select I click outside now
00:46:05
we see here that it is extremely clearer
00:46:07
very well so that is the way in
00:46:11
which we are going to add if I don't have other
00:46:13
resources not here and we have even said
00:46:16
that I can get another here in
00:46:19
information in resources and here I am going to
00:46:23
say María
00:46:26
Fernández very well I am going to say it
00:46:29
accept
00:46:31
it would be the other person in charge of
00:46:33
task 2 Jose Gonzalez of task 1 and
00:46:37
María Fernández of task 2 then
00:46:40
In this way we work on what things we
00:46:43
could do here when I am looking at
00:46:46
the gang diagram, this is a very good shape.
00:46:50
Something quite interesting is that in this
00:46:53
area of ​​the sheet I can add more
00:46:56
columns. Basically, the indicators one would be here, is
00:46:59
someone going to tell me something?
00:47:02
warning
00:47:03
clarification something this column the
00:47:07
next column would be the
00:47:11
manual or automatic scheduling of tasks with the
00:47:13
calendar the next would be the name
00:47:16
of the task this the duration this when
00:47:20
the task begins when it ends
00:47:23
whether there are predecessors or not
00:47:25
and the courses up to that point nothing more but
00:47:28
I can add an infinite number of other
00:47:30
columns, many more columns here
00:47:33
you can add, for example, the following one
00:47:35
tells me how many percent completed of
00:47:38
the task we already have, so
00:47:40
simply select the completed one and
00:47:43
here the percentage would be, it is a new
00:47:45
column and so I can continue adding
00:47:47
many more all of these here when
00:47:51
the cost of overtime begins
00:47:55
fixed cost absolutely everything then there are
00:47:59
many more things so I am going to
00:48:02
leave it as it is only this just this
00:48:06
percentage of completion is we see that
00:48:08
we can add here even many
00:48:11
more columns according to our needs
00:48:14
no I'm going to leave it up to there very well
00:48:17
so in tasks let's not forget that in
00:48:19
view of the fact that this is for us to be able to
00:48:23
appreciate the complete project much better
00:48:26
that it shows me on the right side and we will
00:48:27
constantly be coming to
00:48:29
put the complete project so that it
00:48:31
shows me all
00:48:32
and These are the progress lines of the
00:48:35
tasks from what day to what day very
00:48:38
good then in tasks we still have
00:48:41
many more things let's not forget that we
00:48:43
could change all of these we
00:48:45
have them here that with the right button
00:48:47
all of these are
00:48:49
very good but we are focusing
00:48:51
only on the gang diagram which is
00:48:53
how to work here on the right side
00:48:56
then here in clipboard is the classic
00:49:00
what we generally use in
00:49:03
word these two clipboards and fonts
00:49:07
that we have used at some point word
00:49:09
excel powerpoint and even outlook
00:49:12
access to pavlik service most of
00:49:16
they share that interface here we see
00:49:19
clipboard and let's finish source everything is the
00:49:23
same so in clipboard
00:49:25
I can simply all this here
00:49:29
come and copy then from ibaka copy I
00:49:32
come to the bottom here
00:49:35
and say paste then it has pasted all of
00:49:38
task 1 with all the characteristics
00:49:41
of the same
00:49:43
then I can say here the
00:49:45
predecessor would be task 2 I click
00:49:48
outside it tells me that it is linked I am going to
00:49:51
unlink it at this moment I am
00:49:54
going to select this I am going to unlink
00:49:58
very well now if we do not forget that this
00:50:01
is to unlink and this is to
00:50:02
link
00:50:04
If I tell you here that the predecessor would be
00:50:07
2
00:50:08
ok league out we see how here I
00:50:12
am going to say your complete now the
00:50:14
next one would be after 2 comes
00:50:18
task 3 here is task 3 the task
00:50:21
of task 1 then 3 is day of
00:50:25
after 2 everything else here I can
00:50:29
change the name instead of task 2 I
00:50:32
double click and I can put task 3 and here
00:50:36
the duration remains the same and the dates
00:50:38
are automatically arranged according to the
00:50:41
relationship or linking of them very well
00:50:44
as we have seen we can copy here and
00:50:49
paste or cut it would be the same but we
00:50:52
take it out of its place and put it in a
00:50:55
new place
00:50:56
we cut we come here we paste then we
00:51:00
have pasted it this task but the
00:51:03
linking the dates everything we see that it
00:51:06
has kept me and will probably
00:51:09
generate me some kind of conflict I am going to
00:51:11
do control z the same as doing
00:51:13
a back operation here
00:51:15
so we very rarely use this in
00:51:18
project because each task is
00:51:21
independent, unique and particular
00:51:22
so there are not many times repetitive tasks
00:51:26
even for that I could copy it here and
00:51:31
below Paste it
00:51:34
something additional that we have is applied to
00:51:36
the entire row and with the right button
00:51:39
we would have to insert a new task
00:51:42
in the place where we have clicked to
00:51:45
delete that task or deactivate the task
00:51:48
then if it is your task we see how
00:51:51
the next one has moved towards below
00:51:54
I am going to do control z
00:51:56
for example task 3 and with the
00:51:57
right button you can delete task it is no longer there
00:52:01
see the control z or
00:52:04
right click on deactivate task we see that
00:52:06
here it would be deactivated then I can
00:52:10
activate it again here it would be
00:52:12
deactivated I can go back to activate it
00:52:14
then we see that here we would have many
00:52:17
of those things like
00:52:18
manual programming for that I have here at the
00:52:20
top and I change it very well
00:52:24
then we would have this
00:52:27
cut and paste copy
00:52:29
if I can give a format to one of
00:52:32
these for example to name here and I can I'm
00:52:36
going to click on task one I can
00:52:39
change the font
00:52:41
the size
00:52:44
I can make bold darker
00:52:47
italic inclined underline and a whole
00:52:51
shadow here green color for example and I
00:52:55
change the color of the text from here
00:52:56
white color as we see I have given a
00:53:00
specific format where I am.
00:53:02
I can come here to the copy format part. I
00:53:07
come to another place. I am going to click on
00:53:10
task 3 and I have pasted the format that I
00:53:13
had copied from task 1.
00:53:15
It can be control z or with this operation
00:53:18
back. to return again as at the
00:53:20
beginning
00:53:22
then as we see we can
00:53:26
format here from the source and from here
00:53:30
copy paste and all that very well here
00:53:33
we have added an additional one an
00:53:35
additional space and even this I am going to
00:53:37
collapse so the duration also I do not
00:53:40
need much name of The task is not
00:53:43
very long
00:53:45
here also in the name of resources
00:53:48
I could even put it up to here very
00:53:50
well I am interested in this for example I
00:53:52
am in task 1 and I can say that we
00:53:55
have already developed a percentage
00:53:58
let's say every day I come it tells me 50 %
00:54:00
I have advanced this José González does not say
00:54:04
ah so here I can put 50
00:54:06
percent we can basically put these
00:54:09
0 percent we have not advanced at all
00:54:11
25 percent we see here how it would be
00:54:14
even a little more can be done so that it is
00:54:17
noticeable there
00:54:19
here
00:54:21
a 25 percent 50 percent
00:54:25
seventy-five percent or 100 of
00:54:29
the task almost completed or even
00:54:32
stake itself could give it as
00:54:34
we observe I'm going to change there
00:54:38
very well here we are seeing for
00:54:42
example 70 percent I click
00:54:45
outside we see How has this blue line progressed
00:54:47
much darker
00:54:51
just for this case I'm going to come here I'm going
00:54:54
to say design later we're going to
00:54:56
specify this the height of the columns
00:54:59
24 very well so we're going to see here
00:55:04
for the moment we're going to leave it there
00:55:06
you can see that is not at least what
00:55:09
the progress would be here color a
00:55:13
certain color lighter of the background and the
00:55:16
unasur progress stronger here
00:55:19
we have also said about this task we could
00:55:22
say for example 25 percent
00:55:23
automatically bet with 25
00:55:25
percent but the fact It stands out very well
00:55:28
so here again, in view of the
00:55:32
complete project, you can see the progress. I
00:55:34
'm going to go through it until there and
00:55:38
then we would have the task of the
00:55:41
percentage of progress format and
00:55:45
then we would have here the update
00:55:47
according to the schedule. So if I have
00:55:50
changed internal calendar dates, all of
00:55:53
that I can update according to programming
00:55:56
or update tasks from here, for example,
00:56:00
when I have advanced in
00:56:02
task 3 because I am in task 3
00:56:05
or the duration of the task or things like that
00:56:08
is very good,
00:56:10
then we would have there that respect here
00:56:14
what would be links these links from
00:56:17
here when I'm going to move I would also have
00:56:20
to respect the links so for
00:56:22
example here respect links I'm going to
00:56:26
try to change the start date a little bit
00:56:29
here the start is going to be
00:56:33
instead of what we would have here on the 19th I
00:56:38
'm going to say it on Friday very good as
00:56:42
we see look he
00:56:44
has respected my links only
00:56:47
that he has delayed the task and here saturday
00:56:49
and all this has happened to me highlights on
00:56:53
monday he has kept me then he has
00:56:55
respected my links I am going to do
00:56:58
control z as it was then this
00:57:01
we had said it would be to deactivate
00:57:03
the task I am going to select the task gaga
00:57:06
deactivate it cannot be deactivated it
00:57:09
tells me because it would be related to the
00:57:10
previous one
00:57:12
so if I unlinked it this is
00:57:14
to unlink let's not forget
00:57:17
now yes
00:57:19
and it tells me that it is in progress I have to
00:57:22
be careful that I can select the
00:57:24
task and say 0% progress now
00:57:27
I can deactivate it if it had a progress you
00:57:30
cannot deactivate it because we would lose the
00:57:33
task practically
00:57:34
again I click on deactivate and
00:57:37
again it would be enabled and I tell it
00:57:39
50% progress it is telling me that I
00:57:43
have unlinked I can with this link
00:57:46
I could select this so
00:57:49
left click on this side
00:57:51
held and dragged it all the way down and
00:57:54
I can link it as we're seeing today
00:57:57
I'm going to do control z so I have to be
00:58:00
very careful the way
00:58:02
I'm going to link it from here but the
00:58:05
date we see that it is not coinciding I am going to
00:58:07
do control z and from here I am going to
00:58:10
say when this ends it would be
00:58:13
Thursday so it would be Friday the 8th I am going to
00:58:18
look for Friday the 8th very well and even this
00:58:22
ends
00:58:24
if Monday the 18th is the end then here
00:58:29
the Tuesday the 19th we would have to
00:58:32
start Tuesday the 19th
00:58:34
now yes it is already then when
00:58:38
you linked it with the previous one it would be
00:58:41
correct I just select the two
00:58:43
tasks that I want to link and the
00:58:45
links or directly here in what
00:58:47
we have said
00:58:48
predecessors I click and selected
00:58:51
the task do the same, either
00:58:53
of the two modalities are valid
00:58:57
passing this other group and even before
00:59:00
here we are not seeing very well we can
00:59:03
divide task this we are forgetting
00:59:05
we could here divide the task for
00:59:08
example 3 I can divide the and here I
00:59:12
come and do a click more or less on the
00:59:14
date for example Thursday the 21st I click it
00:59:17
has divided it the same task it has cut it
00:59:20
to and I have spent a few days going on days it has
00:59:25
continued the task simply nothing more
00:59:28
than it is as if we had paused
00:59:30
in the task and we see it continued
00:59:34
very well I'm going to do here control z I
00:59:37
'm going to leave it as before this is quite
00:59:39
interesting it's going to allow us to
00:59:41
more or less organize our work
00:59:44
in a kind of
00:59:46
phases or steps if we want to put it like that or
00:59:50
periods which we're going to classify
00:59:53
several various of they in different with
00:59:57
different tasks
00:59:59
here at massera we are going to see you in the
01:00:01
winning diagram we would have
01:00:03
summary tasks we will never see that we will be
01:00:07
able to appreciate when we place with the
01:00:10
respective tabulations the
01:00:12
summary tasks of the entire project and the number
01:00:15
of schemes very well here we would have that
01:00:19
automatic enumeration but what
01:00:22
interests us here would be mainly these
01:00:24
two project summary tasks and
01:00:26
summary tasks for example I am going to
01:00:29
return to tasks I have activated both
01:00:31
this is the main title that is the
01:00:34
project and I can change it logically
01:00:36
the name here I can say
01:00:40
main project a project one that
01:00:44
would be our entire project itself or
01:00:47
simply the project nothing more
01:00:50
then we need these in phases what I
01:00:54
am going to do now would be add more
01:00:56
tasks
01:00:57
so I can put for example task 4
01:01:01
it will last It's going to start in about 8 days
01:01:06
so you don't put the dates directly, I
01:01:09
tell the predecessor and she's going to organize
01:01:11
the dates so when 2 ends,
01:01:13
3 will start and when 3 ends,
01:01:16
the current one will start, which would be 4,
01:01:19
we see how automatically
01:01:21
The date has been reorganized when it ends here on
01:01:24
the 25th, it will continue on the 26th with this and
01:01:28
here it is being observed and then
01:01:31
I will say either of the two, there is no
01:01:33
problem because of how the tasks would be separated, that
01:01:36
is, one after the other,
01:01:38
so never the same staff is going to collide
01:01:41
for two tasks then I can
01:01:44
continue putting let's see here that
01:01:46
we wouldn't have any more
01:01:48
columns so I'm not going to stay there like
01:01:52
that
01:01:54
percentage there is
01:01:57
this task mode I could also
01:02:00
drag it a little bit
01:02:02
as you know if it's not affecting this no
01:02:04
I want the height to change a lot until
01:02:07
there approximately
01:02:08
very good then I am going to put
01:02:12
tasks 5 it will last three days it
01:02:16
will not last about six days
01:02:20
and the predecessor would be 4
01:02:24
very good and it will be in charge of Maria
01:02:27
then tasks 6
01:02:31
it will last here about 15 days or about 10
01:02:36
days
01:02:37
with predecessor 5 and Maria will also be in
01:02:41
charge and will continue the
01:02:43
previous task
01:02:45
then here we see how in view I am going to
01:02:49
come complete project is
01:02:50
showing all of these
01:02:53
task
01:02:55
7 will have a duration
01:02:58
about 14 days or less two weeks
01:03:03
once the six finishes it continues and
01:03:07
will be in charge of
01:03:09
jose
01:03:11
then a task 8 similarly
01:03:15
only seven days it will last
01:03:19
it will depend on the seven terminal to
01:03:22
six in this case the seven and Continue
01:03:25
with eight,
01:03:27
pass it on to María
01:03:31
then on task 9
01:03:35
more it will last approximately 20
01:03:39
days
01:03:43
it will start with the predecessor of 8 here
01:03:47
in view of the complete project and José will be
01:03:52
in charge
01:03:53
very well so as we see it
01:03:56
has automatically been organized here and
01:03:59
We have put tasks here, what we
01:04:02
wanted to say in this task with the
01:04:04
tabulation part would be that we are going to
01:04:07
place a kind of more or less
01:04:11
some headings, some phases
01:04:14
to be able to group all of these,
01:04:18
for example here I can insert, we
01:04:21
said here click with the right button
01:04:24
I can insert a new task so
01:04:27
here it is from the new task
01:04:30
to this task I can put here
01:04:34
phase 1
01:04:36
and like all this from both task 1
01:04:41
so I can select up to task 3
01:04:44
it will be phase 1 with this I do click
01:04:47
now you have understood that this would be the
01:04:50
part of what we had seen here
01:04:53
summary tasks this is the
01:04:56
summary task as we see
01:04:58
this is the summary task of the entire
01:05:02
project and there is the summary task that
01:05:05
would be more or less the phases I'm going to
01:05:08
leave just this here I can do
01:05:11
the same before before we're going to add
01:05:14
as we have indicated
01:05:16
right click and a certain task and here I'm going to put
01:05:20
phase 2 all in capital letters so that it can be
01:05:23
seen better
01:05:25
and all these three and even
01:05:29
four with this I am going to say here
01:05:32
tabulation
01:05:33
we apply this indentation
01:05:36
and I am going to remove this
01:05:40
and now yes
01:05:42
and this I am going to do an operation
01:05:44
back now yes this indentation back that is to say we have
01:05:49
canceled the indentation you understood
01:05:51
that that day what we have indicated
01:05:53
summary of task
01:05:56
all these and here we apply the same
01:05:59
right click insert task
01:06:03
and here I am going to delete everything and I am going to say
01:06:06
phase 3
01:06:10
20 and these
01:06:13
and even this so that it is not at this
01:06:15
level I am going to make an indent here back
01:06:21
and all These we indent forward
01:06:25
has automatically understood that
01:06:27
the phase would be this a
01:06:30
summary of tasks and
01:06:33
then we see that we would have phases
01:06:36
therefore
01:06:39
if we see here phase 1 it tells me that it lasts
01:06:41
17 days and added here 5 7 12 + 5 17
01:06:49
the first of the fourth month to
01:06:54
spend on the first of the fourth month and
01:06:56
ends on the 25th of the fourth month to
01:06:59
spend on the 25th of the fourth month, that is,
01:07:01
all this has automatically separated me
01:07:05
very well and there is no predecessor here because
01:07:08
it would be more or less indicative of
01:07:10
some phases
01:07:11
so this is going to be very easy I
01:07:14
can just organize it I can
01:07:16
also collapse them
01:07:18
to see it like this if I had many phases
01:07:21
if I want to move the phases I come here
01:07:25
and start with this to move so I
01:07:29
can better see all the
01:07:31
internal tasks and here would be a indicative in
01:07:35
the gang diagram here with these lines
01:07:39
that tell me that it would be a summary of
01:07:42
tasks all this very well so in
01:07:46
tasks we would have these two indentations or
01:07:49
tabulation is to be able to organize in
01:07:52
this way in phases
01:07:54
the guards we also had for all
01:07:58
the tasks show The warnings on
01:08:01
the left side are activated I can
01:08:04
show suggestions here if anyone has
01:08:07
suggestions or I can show
01:08:11
omitted problems here it will tell me everything
01:08:13
here very well I will leave it as it is I
01:08:16
can deactivate and even this
01:08:19
warning here
01:08:22
also some particular task for For
01:08:24
example, at 6, I could come here and
01:08:26
postpone a week or a day, I'm going to say
01:08:30
a week, we see how that has
01:08:33
been a whole week. From here, I'm
01:08:35
going to do control z. Let's not forget that
01:08:39
here, for example, task 4,
01:08:43
I can see the selected task in view. I
01:08:48
'm going to remove all of this a
01:08:51
little bit now yes
01:08:53
then I can postpone it is very
01:08:55
similar when we have cut the task with this
01:08:58
and we have divided but here we
01:09:02
have simply postponed it from
01:09:04
the postponed from the beginning here
01:09:08
a week for example then
01:09:11
from where It was postponed a
01:09:13
week very well or it could be a day here
01:09:21
as we are observing very well
01:09:24
I cannot advance the task one day for
01:09:27
example it would be the 4th I can advance it here
01:09:32
a whole week but it depends
01:09:36
also here in view I am going to say
01:09:38
complete project is depending on the
01:09:40
previous one very well then it would be here
01:09:44
for that I am going to leave it as it
01:09:47
is and then we would have here in the
01:09:51
form of these new tasks created it is
01:09:55
the same as here at the bottom
01:09:56
that we have said it is the same let's see here I am
01:09:59
going to say that the next task that I
01:10:02
am going to add is going to be manually here
01:10:05
it is manually if I come here and change it
01:10:08
here we see how it has changed at the
01:10:11
bottom it means that the new task
01:10:13
that I am going to add as it says here is going to
01:10:16
be scheduled automatically then
01:10:18
I can change this functionality from
01:10:21
here or from the bottom
01:10:22
either of the two
01:10:25
here we would have to insert for example
01:10:27
a new task I can click we see
01:10:31
how I added a new task and
01:10:33
here I can write we have
01:10:36
also indicated that
01:10:37
what information can be entered applies
01:10:40
and change the name I propose task
01:10:45
10 it has a duration
01:10:49
of about eight days or nine days
01:10:54
predecessors does not exist here you could
01:10:57
select and say after task
01:11:00
9
01:11:01
and now I say to accept we see how in
01:11:05
this place I am going to come to the
01:11:08
complete project here immediately I It has been put, that
01:11:11
is, automatically, as I had
01:11:14
added previously, similarly, it
01:11:17
has done it to me now, simply because I have
01:11:20
entered information here and I have also
01:11:24
clicked on task so that it does not
01:11:25
add a new task. You don't know,
01:11:28
we use this because when I click
01:11:30
here immediately It already creates the new task for me,
01:11:33
there are repetitive tasks
01:11:35
that I could create one
01:11:38
directly in a periodic task,
01:11:42
for example an evaluation, I click since it
01:11:46
would put evaluation
01:11:51
very well, I am going to say that it is repeated a
01:11:55
week
01:11:56
every week on Monday, Tuesday very
01:12:02
well
01:12:03
and it can have a duration of about we
01:12:07
are going to leave it like this one day we see how
01:12:10
here all this is added from one
01:12:13
date to another date they are repetitive tasks
01:12:17
immediately I put it in
01:12:18
evaluation it can be control z
01:12:22
[Music]
01:12:23
and then this next time it goes to
01:12:25
insert a task here
01:12:29
periodically I would have to take into account
01:12:31
that when it has finished and when it has
01:12:34
started if we see here it had started on
01:12:38
the first of the fourth month until the
01:12:41
eighth month until the 5th of the eighth month that is
01:12:44
why I have put it several times
01:12:45
if I I would only put here Monday and
01:12:49
Tuesday if you counted
01:12:52
from here and I say, for example, the fourth
01:12:57
month,
01:12:59
April, let's see
01:13:03
and it is starting on the first of April,
01:13:05
so I am going to say up to here, a
01:13:10
week
01:13:12
and even this begins to
01:13:14
understand better here the 4th
01:13:17
begins On the 4th we can better understand
01:13:24
opening until then one week two
01:13:28
weeks three weeks until here until
01:13:31
Friday the 22nd is three weeks
01:13:34
and I told you Monday and Tuesday so
01:13:37
if I say here two days this headquarters will
01:13:41
accept as there are three weeks in total
01:13:44
it would be six tasks because on Monday and
01:13:46
Tuesday here would be tasks 12 by the
01:13:50
corresponding name
01:13:52
so these tasks are repeated in a
01:13:55
way independent of the other tasks
01:13:57
that there is a codependency that there is a
01:14:00
form of relationship or link with the
01:14:02
other tasks these are not repeated several
01:14:05
times They could be evaluations,
01:14:09
daily meetings, different dates, for
01:14:12
example, I'm going to do control z here, I
01:14:16
could delete all of this, I
01:14:19
position myself here,
01:14:22
insert periodic tasks and I tell you here it's
01:14:27
simply going to be something like an
01:14:30
analysis of the tasks, so I'm going to
01:14:34
say that only one is repeated. time
01:14:37
every Friday there will be the analysis of
01:14:41
how the project is going
01:14:43
so we say that it will start here
01:14:47
this Monday and we will do a
01:14:50
week here so it would be Friday from here that it
01:14:54
starts and in fact it would already be here 1 2
01:14:58
3 4 5 then until 29
01:15:04
very good until the 29th
01:15:07
therefore there are going to be five analyzes
01:15:10
because these five Fridays starts here
01:15:12
ends here he accepted and we see here that
01:15:16
there are five analyzes one two three four or
01:15:19
five
01:15:20
logically their heading is the
01:15:22
same therefore this Friday given
01:15:25
each one an analysis, let's not take
01:15:28
this into account because even if I come here
01:15:30
and say I don't want to see summary tasks,
01:15:32
these are the progress analyzes of the
01:15:35
project
01:15:36
here on this date the same is given here
01:15:40
until the start date if we see it is one
01:15:43
day nothing more and the next analysis
01:15:47
next Friday then the next
01:15:49
analysis next Friday and so on
01:15:50
every Friday they do an
01:15:54
independent evaluation so this
01:15:56
has nothing to do with the
01:15:59
correlation with these or with what
01:16:02
the links would be because the tasks will
01:16:04
continue to advance these are
01:16:06
independent tasks that repeat every
01:16:09
Friday
01:16:10
very well then that would be a task
01:16:13
I can put a blank row at the
01:16:15
top it would be the same as coming
01:16:17
right click insert task
01:16:20
here
01:16:22
very good that fundamentally here I can
01:16:26
insert a summary task For example,
01:16:29
all of these we have used the
01:16:31
summary tasks with what would be the
01:16:33
indentations
01:16:35
so if I come here these are
01:16:37
summary tasks they are already with these here
01:16:40
so I can say here too
01:16:43
let's see if it allows me to add a
01:16:46
summary task and if I do added
01:16:49
we did not have it here from here to here
01:16:52
so I can say it
01:16:54
here by double clicking I can add and
01:16:58
say analysis
01:17:01
and I say here it even tells me that it is going to be
01:17:04
summarized to accept therefore I
01:17:07
could this eliminate
01:17:11
all of these before they could put them
01:17:13
towards back here this indent back
01:17:20
and this you delete and with the right click
01:17:23
delete task then here I just
01:17:28
added what would be a
01:17:31
summary task then it would have a milestone a milestone
01:17:35
would simply be a particular event
01:17:37
just like these are tasks
01:17:39
independent of the entire project a
01:17:42
milestone is like one of these milestones nothing more
01:17:45
so for example here let's
01:17:47
say after the phase up to one I'm going
01:17:52
to say that it's going to be an evaluation
01:17:55
right click here the whole row and a
01:17:57
certain task that's why
01:17:59
I'm going to do control z I want it
01:18:01
further down there better right click and it will be
01:18:04
task here and I am going to write it and I am going to
01:18:08
say
01:18:11
evaluation
01:18:14
very well we are going to evaluate the entire phase 1
01:18:19
and here in task
01:18:22
information or with this I say it and
01:18:25
then I am going to do control z
01:18:28
directly I added it or here
01:18:30
we do it in information
01:18:33
and here it has advanced we decided to mark
01:18:37
this task as a task as I say accept
01:18:41
because it only lasts one
01:18:43
day and with this I am going to return there or there
01:18:48
very well it doesn't matter
01:18:50
we see that it only gives me a point
01:18:52
nothing more because it lasts a
01:18:54
single day and in fact here I can put a
01:18:57
single day like this
01:19:00
and it is marked as a milestone very well if you
01:19:03
added if you enter information and advanced
01:19:06
it is marked as a milestone it is an
01:19:08
independent point no it will not take several
01:19:12
days or resources or things like that, of course, I
01:19:16
could put all the courses that would
01:19:18
be involved in the same thing that we just
01:19:20
did manually here
01:19:22
we could add a milestone and
01:19:25
here directly automatically in
01:19:29
tasks here milestone we see how he
01:19:32
added a milestone to me I'm going to do control z
01:19:34
I am going to position myself here in phase 3 so
01:19:38
that I slowly move upwards added milestone
01:19:41
now here I write evaluation
01:19:45
this would be the evaluation but from phase
01:19:50
2 so it has directly put me
01:19:52
like a little point it is not
01:19:55
interfering with the regular tasks here
01:19:58
or with the repetitive tasks
01:20:01
like those of the analyzes then it would be
01:20:05
here here also at the end of phase 3
01:20:07
here I am going to position myself so that at the top I
01:20:10
put a space generated a milestone and I
01:20:13
say here I am going to eliminate this and I say
01:20:16
evaluation
01:20:19
very well
01:20:20
here the same as these 0 days this one
01:20:24
you can also say 0 days it will not
01:20:27
take anything in a couple of hours just
01:20:29
the evaluations here very well as we see
01:20:32
they are some points that we have set milestones
01:20:35
to work on related projects
01:20:37
here we would have these homework
01:20:40
in the part here deliveries and
01:20:43
dependencies then this information
01:20:46
that we have just used constantly
01:20:47
so we position ourselves it gives us the
01:20:49
information of the task if I come here
01:20:53
information for example of task
01:20:55
number 3 I position myself there information
01:20:59
here would be generating the predecessor to
01:21:03
3 is 2 the resources are these jose
01:21:07
gonzalez and advanced we have not said anything
01:21:10
here these are the notes that we could
01:21:14
add and custom fields do not
01:21:17
have any custom field the
01:21:20
same in notes so you can add
01:21:22
a note here for the same reason as coming here
01:21:25
and we add homework note of the 3 I do
01:21:28
click and I say
01:21:32
this task is extremely important
01:21:37
we have to treat it
01:21:41
carefully
01:21:45
I say accept the left part it
01:21:47
seemed like a note symbol when
01:21:50
the mouse passes over it tells me the note that I just
01:21:53
placed if I come to the information in notes
01:21:57
it is here then it has also been inserted
01:22:00
from here
01:22:02
something that we have said in the
01:22:04
view part here we would have details at the
01:22:07
bottom how I am positioned in
01:22:10
task 3 it gives me the information for
01:22:13
task 3 it positions me in task 4 it
01:22:16
gives me information for task 4 how many
01:22:19
days does it last here what is the resource
01:22:23
used what date starts what date
01:22:26
ends what is the name and here I can
01:22:29
see the next task which would be 5
01:22:32
our power browsing task by task I
01:22:34
am going to remove details in the
01:22:37
task tab where I am positioned I can access
01:22:40
the details here of the task in
01:22:43
question and again it opens the same thing and
01:22:46
I can navigate between them
01:22:48
or remove the same something that we had
01:22:52
removed here in view would be
01:22:55
timeline so in timeline
01:22:57
we could here we have added
01:23:01
no task so the
01:23:04
corresponding tasks here in the
01:23:06
task tab I can add to the
01:23:09
timeline then here on the
01:23:12
timeline I can click we see that all
01:23:14
phase 1 is added I also
01:23:17
position myself in phase 2 I come here and
01:23:20
we add phase 2 then phase 3 and
01:23:24
so on successively we add
01:23:26
as it happens, for example this
01:23:29
task 1, if I'm going to add it, task
01:23:32
1 corresponds here to phase 1, then
01:23:37
task 2, I'm also adding
01:23:41
task 3 here, we see how it is organized, then
01:23:45
task 4 here, but that belongs here to
01:23:50
phase 2
01:23:51
I'm adding tasks here
01:23:55
task 4
01:23:59
here it's putting me in phase 1 I'm going to
01:24:02
do control z later we're going to see
01:24:05
this about the time scale we're going to
01:24:07
better organize the dates in all of
01:24:10
that so for example here I can
01:24:13
remove it from what it was and put
01:24:17
task 4 to task 5 and so later
01:24:21
we are going to see this and we are going to organize it
01:24:24
on this side from the time scale itself here
01:24:27
in this way then we are going to
01:24:30
see all of these in detail options
01:24:32
at the moment we know that the task
01:24:35
gives us the opportunity to add
01:24:36
all this on a time scale so that
01:24:39
later when I see this I
01:24:41
will only understand how the
01:24:43
project is going but in a horizontal line
01:24:48
very well so if I come to view
01:24:51
skites that Talk about time, let's not
01:24:53
forget that here I click with the
01:24:54
right button I can see the
01:24:56
time scale in the entire work area here
01:24:59
everything is complete and then I am going to add
01:25:01
tasks as now we have seen one by
01:25:05
one but we are going to do it in a
01:25:06
a little more advanced when we
01:25:09
get to this option I'm going to
01:25:11
right click I'm going to return to the
01:25:12
diagram get
01:25:15
here we have seen a quite
01:25:17
particular way in view 1 that was
01:25:21
complete project everything shows us or if I am for
01:25:23
example in task 3 in view here it
01:25:27
told me all the selected task can
01:25:31
return to the complete project if I am
01:25:33
a task 3 to whom task I can say
01:25:36
move to the task in question because
01:25:38
if done it is a quite for example it
01:25:41
is not showing me in the gang diagram
01:25:43
task 3 is This level is
01:25:46
hidden I would have to scroll
01:25:47
that way to save time what it
01:25:52
is giving me here would be let's not
01:25:54
forget that we are in the
01:25:56
task tab here in scroll task then it
01:25:59
shows me in task 3 here
01:26:03
much more clearly
01:26:05
this same zoom we could here in this
01:26:08
case at the bottom and regulate it
01:26:10
also or in view we have said complete project
01:26:15
assemble we would already have here to search for
01:26:17
a word of all this is a
01:26:19
normal search engine or replace a word
01:26:22
with another of the existing ones
01:26:24
for example in search I can search here
01:26:28
phase
01:26:31
and I'm going to leave everything as it is and I say
01:26:34
search then all the words that
01:26:36
are so easy it shows me
01:26:39
so what I can do would also be to
01:26:42
replace it instead of for example
01:26:46
saying evaluation
01:26:47
[Music]
01:26:49
I can put here it goes to look for all the
01:26:53
evaluation words and it is going to
01:26:54
replace it with test
01:26:57
very well then I say replace all it
01:27:01
tells me that it has replaced three to spend
01:27:04
the test test and tests 9 you can do
01:27:08
control z and I have left it as it is
01:27:10
before or with this option and
01:27:14
then I can delete links if there were
01:27:16
links here and then the
01:27:19
hyperlinks are the links or the notes,
01:27:23
for example here I have a note, I could just
01:27:26
give the notes all the notes and
01:27:29
deleted,
01:27:30
we could give an entire row, for example
01:27:33
from analysis 5, I can delete an entire
01:27:37
row
01:27:39
or I could delete the format if I have formatted it
01:27:42
for example I put a
01:27:46
yellow shadow and a red text color
01:27:52
and much more so here we are going to see
01:27:56
we are going to delete the format selected
01:27:58
there and it deleted only the format without
01:28:01
needing to delete the content as well
01:28:04
I could delete everything we have here in
01:28:08
the selected element I'm going to do
01:28:10
control z very well then I could fly
01:28:14
here for everything it
01:28:16
can be control z and here
01:28:19
we would also have to fill from bottom
01:28:22
to top
01:28:23
or add elements of the same let's
01:28:27
now see the diagram ghana
01:28:29
before going to the resources tab one
01:28:32
knows about this that
01:28:33
we were constantly analyzing based on it
01:28:36
all the tasks that we have added the
01:28:39
resources all of that so that they are seen in
01:28:41
an adequate way so we are going to
01:28:44
go into it a little bit and then we are going to
01:28:45
move on of course blinds and everything that
01:28:47
corresponds here in the different
01:28:49
tabs,
01:28:51
therefore, being here we know that
01:28:53
we are in a gang diagram if
01:28:55
we were in another way, for example,
01:28:56
a calendar here, as we see within the
01:28:59
calendar, we see the different
01:29:01
activities, all of that, I click with the
01:29:04
right button and I say and I'm going to come to
01:29:06
gang diagram now I already have here the
01:29:08
diagram of the so the first thing
01:29:12
we're going to see is a group called format
01:29:15
I come here and I say change the styles it's
01:29:18
like coming here it's a task and it uses all
01:29:20
these then the same here I click and
01:29:24
instead of the default letter I can
01:29:26
change to another one for example century
01:29:28
gothic is quite nice and even
01:29:31
change the size to 16 and it puts everything
01:29:35
underlined and even change the color I
01:29:37
can change the plot to another
01:29:41
It exists here, the existing one is very faint,
01:29:44
I'm not going to leave it like this and I'm going to say accept,
01:29:48
now we see how the color, the
01:29:50
size, has changed and we even said that we could
01:29:53
change the color itself here, for example,
01:29:56
a green,
01:29:57
now we see how it would be like a
01:29:59
green color, so we could make others,
01:30:02
such as for example the background color that
01:30:04
it had, I'm going to put yellow and the pattern
01:30:08
so that it can't be seen, if not, a kind
01:30:11
of stripes here, then I'll say accept,
01:30:14
let's see how it would be now, very good, I'm not going to
01:30:18
leave it as it was, I can't put everything
01:30:21
as it was or simply do control
01:30:23
z
01:30:25
very well then if it would be as before
01:30:29
another thing is that there are
01:30:30
grids that we are managing in the
01:30:32
sheets and even here I can change it in
01:30:35
this place it
01:30:37
is simply visually just
01:30:39
like the other format
01:30:40
we would also continue talking about the visual form
01:30:44
of the way in which we are going to
01:30:45
see our data but not so much about the
01:30:48
functionality, for example here in the
01:30:51
gang rows we could say it in this
01:30:55
place
01:30:56
change another type of line or a
01:30:59
dotted line here I will do all that to leave and
01:31:04
the color red
01:31:07
then I say here accept we see how in
01:31:11
this right part it is with these
01:31:13
horizontal red lines I am going to do control z
01:31:17
we would also have a grid for
01:31:19
each of the things in the current date
01:31:22
sheet rows for example in the rows
01:31:26
of I am going to leave the leaves as they are, you
01:31:28
can put a
01:31:29
red color and the columns could put a
01:31:33
green color, it will be very faint here
01:31:37
until days there is horizontal red on the sheet and
01:31:40
green here also
01:31:43
the rows in red the lines and
01:31:45
columns in green I'm going to do control c I'm
01:31:48
going to leave it as it is so in the
01:31:50
grid I could change a lot of the
01:31:52
appearance of how we are seeing the
01:31:54
diagram. I
01:31:56
could also change the
01:31:58
progress line this here on the right side
01:32:01
could show you the date of the
01:32:04
status of the project on the current date
01:32:07
a progress line that is going to be a
01:32:10
little uncomfortable because as we
01:32:12
see this we are used to a
01:32:14
fairly clean presentation
01:32:17
so if I say accept here we are going to
01:32:21
put the progress line on the
01:32:23
current date we see how these points would be here
01:32:26
At the current date, how would they
01:32:29
be moving? All of them still
01:32:31
need to be finished. It could be z control.
01:32:36
Very well, we
01:32:38
would also have to show other
01:32:41
lines of progress here at the current date on
01:32:43
Mondays, Wednesdays, all those days,
01:32:48
how about the progress with that same
01:32:50
line, then we would have a design. This is from
01:32:54
here how those links come together
01:32:57
that we have put these little arrows from one to
01:32:59
another here you could see it in a different
01:33:02
way for example it would be like this
01:33:04
with its little arrow one ends one begins the
01:33:07
next one it could change for another we see
01:33:10
how now it is different in this place
01:33:12
very well they could also say that
01:33:16
since it is a little flatter
01:33:19
the arrows do not show those lines but
01:33:22
they are
01:33:23
linked because here if we always see
01:33:25
certain they would all have
01:33:28
their respective previous elements
01:33:33
so here task 2 is preceded by the
01:33:36
task in this case to one but if
01:33:40
we observe here we have said that this is
01:33:42
the task
01:33:43
task 2 task 1
01:33:46
we are taking into account this of the
01:33:48
rows so task 3 is preceded
01:33:52
by what would be in this case task 4
01:33:55
which precedes task 3 which would be very good
01:33:59
so here in design we would be seeing
01:34:03
is I'm going to leave it as at the beginning the
01:34:05
date format for example if we
01:34:08
get closer here we see 0 1 in this milestone 0 4
01:34:13
so
01:34:14
it was the first of April
01:34:17
I could try to make it different for
01:34:20
example like now in a more literal way
01:34:24
like the name in the date the name and
01:34:27
the year here
01:34:28
if I say accept we see how it would be much
01:34:30
clearer but what we have chosen is
01:34:33
quite short quite nice
01:34:35
so I will always prefer to use
01:34:37
the shortest possible like this very good
01:34:41
and we are not putting the year because
01:34:42
a project is supposed to be generally
01:34:44
useful and last a year if it is going to last more than
01:34:47
a year then I am going to do something like
01:34:49
this
01:34:51
here as we are seeing very well do
01:34:55
they say and then we would have the high of
01:34:58
bars would be this the height I am going to leave it
01:35:02
we could make it much smaller it
01:35:04
is not noticeable because we are recording
01:35:05
in 4k so it is not wanting to
01:35:09
stretch or it is respecting the size
01:35:11
very well when we do not increase the
01:35:13
size exponentially on our
01:35:16
monitor just to record we
01:35:18
have just increased it so this is going to
01:35:20
work properly I am going to leave it
01:35:22
at 24
01:35:24
very well then round bars up to
01:35:27
full days many divisions in
01:35:30
the bars for example this could say
01:35:32
no and show drawings so
01:35:36
some divisions here we see that it
01:35:38
would already be completely clean it is no longer
01:35:40
showing me the same ones and in fact I am going to
01:35:42
leave it like this very well now after the
01:35:46
format set we would have the
01:35:49
column one because as we see most of it is
01:35:52
about the appearance of organizing the
01:35:54
work areas if we do not use it to
01:35:57
nothing, this would be perfect because many
01:36:01
times we are more interested in the functionality
01:36:02
than the appearance of our project,
01:36:05
of course, to print
01:36:07
we would just have it there since they analyze how it is
01:36:10
going to be printed, but to work not
01:36:12
much
01:36:13
here we would have the group of columns,
01:36:17
not only can you enter one new
01:36:18
column at the end here
01:36:20
I can choose the type of element that
01:36:24
this column will have as previously
01:36:25
indicated that we had put the
01:36:28
percentage of completion here we would have
01:36:31
many more according to our needs
01:36:34
then it also highlights
01:36:37
anywhere you can insert through this group
01:36:39
in the Ghana diagram insert column and
01:36:42
it tells me what type of column it is going to be, what
01:36:44
data it
01:36:46
is going to incorporate, for example, costs,
01:36:48
contact with the person who will be
01:36:51
confirmed or not, there is a fixed cost here,
01:36:55
if it is active or inactive, any
01:36:58
warning that it should have, such as
01:37:00
the left and so then an infinite
01:37:03
number of them we could put them
01:37:06
here as they go we could see according to what
01:37:09
we are going to need to add one
01:37:12
and even in these texts
01:37:14
I could personalize my column
01:37:16
simply say what type of element
01:37:19
the program is going to have mind I am going to
01:37:21
press the escape key we already know where
01:37:24
where it is to insert a new
01:37:26
column or directly move it to the end
01:37:28
so that it does not interfere with this
01:37:30
then we would have this here I am going to pass it
01:37:35
so we would have the default alignment
01:37:38
of the entire diagram from left to
01:37:40
center to right then as we see
01:37:44
here it could be like this
01:37:47
and if logically we select everything it
01:37:50
can be in the center
01:37:51
very well we are going to leave it there everything
01:37:55
that we have selected
01:37:56
like this or on the right it tells me that some
01:38:00
columns that are not wanting to perform
01:38:03
the operation very well
01:38:06
I will do it to come back as it was very good
01:38:09
everyone then it has gone again to the
01:38:11
left
01:38:12
then we would have here some of the
01:38:15
texts for example here evaluation we see
01:38:18
I can say in this case to jump or not I
01:38:22
am going to select everything I am going to say that
01:38:25
it is art or it is
01:38:27
not For example, here analysis I don't
01:38:30
want it to be hidden, I could try to make
01:38:33
the jump downward or if it has
01:38:36
more words, make the jump much
01:38:39
lower. I'm going to leave it as it is,
01:38:45
for example,
01:38:48
periodic evaluation, I'm going to put it
01:38:51
very well, as we see. It comes down if
01:38:54
I tell it that it does not respect me horizontally
01:38:58
then the next word has already
01:39:00
had to go down in that way it is
01:39:04
convenient for us that the word be seen completely
01:39:06
and not hide there to
01:39:09
try to call space then it is not
01:39:11
convenient I prefer it to be down
01:39:14
the complete word here or the
01:39:17
complete sentence so I'm not going to leave it as
01:39:20
it is and I'm also going to delete this
01:39:22
word that I just added I'm going to
01:39:24
press enter you
01:39:26
could also have the
01:39:27
column configurations here for
01:39:29
example hide a specific column
01:39:31
this when it's finished
01:39:33
I can come here and hide I'm going to do it
01:39:37
control z
01:39:38
we could wrap the text just like we
01:39:41
just did we can wrap the
01:39:43
text in the column where we are
01:39:45
fine then here are
01:39:48
custom fields if I click this
01:39:51
is what we just indicated that For
01:39:53
example, for text 1 I can put
01:39:56
my own name, that is, here when we have
01:40:00
added a new column, for example,
01:40:02
I can do it like this
01:40:05
in text 1 here at the bottom
01:40:08
we had text 1
01:40:11
much lower
01:40:13
here instead of text 1 I can here
01:40:16
put what I want then in
01:40:20
configuration, for example text 1, I say
01:40:22
change the name and I'm going to say observations here and
01:40:27
have people write
01:40:30
and it tells me very well, it's going to be here
01:40:32
observations and I can say it here to
01:40:36
accept, I
01:40:38
couldn't start putting attributes, for
01:40:40
example, some formula that we will always
01:40:44
need and here the calculation of the
01:40:47
group summary rows or calculations of
01:40:50
the assignment row or values ​​to
01:40:52
show
01:40:53
then it will be with data, I could
01:40:56
say other graphic indicators, I am going
01:40:58
to leave it as it is here It can be a
01:41:01
task or a resource, in this case I tell you
01:41:05
that observations will not only be
01:41:07
a text, it can be a date
01:41:10
here and I would change the name of the date
01:41:13
but we are working with texts
01:41:15
so in the first instance we would have
01:41:18
this observations, you have to accept,
01:41:20
we see. Here it says observations, I have
01:41:23
a space for observations, for
01:41:26
example, if I want to add another space
01:41:27
here,
01:41:28
a date, something here in
01:41:31
custom fields, I say I can configure the
01:41:34
date or the duration or the end, all of
01:41:38
those are already here or a specific number,
01:41:41
the cost, for example, we don't have it. here
01:41:45
then where it says cost 1 and I can
01:41:48
change the name and say
01:41:51
final cost or total cost
01:41:55
and I'm going to say accept now I say
01:42:00
accept when I come to add here in
01:42:03
costs here
01:42:06
in cost we would also have set 12 let's
01:42:09
look here for
01:42:11
total cost we see how I has put the
01:42:15
euro symbol we have said that
01:42:17
we could also configure other
01:42:20
file symbols to drop options
01:42:25
and here instead of it showing me in
01:42:29
euros we have said that we could use
01:42:31
the dollar symbol so we are going to
01:42:35
search with the one
01:42:38
over here
01:42:40
or generally This we use
01:42:44
the dollar symbol and I say to accept
01:42:46
now as we see here it is not in euros
01:42:49
it would be in dollars very good so
01:42:51
that is what the columns are for I have one
01:42:53
with an observation and you can configure
01:42:56
all those columns here all that
01:42:59
data here I am looking for this is a way of
01:43:01
categorizing I look for, for example, the
01:43:04
beginning here I have several beginnings
01:43:07
I have a duration several durations
01:43:10
all of those would be why I come here they are
01:43:13
not yet personalized they are
01:43:15
generic each time I come add a
01:43:18
new column there would be all of these and the ones
01:43:21
that are repeated here baseline start
01:43:25
baseline cost all of this is not yet
01:43:27
personalized they are generic
01:43:31
we have personalized it like here
01:43:33
for example for cost 1 we have put it
01:43:34
subtitle total cost and the type of data
01:43:38
that cheese factory should have here in
01:43:41
dollars very good
01:43:44
so here you can customize my
01:43:46
fields That is to say, my columns
01:43:49
I am going to go through this a little bit until there,
01:43:51
for example, you
01:43:54
can still configure many more
01:43:56
things about the appearance. We continue with that
01:43:59
in the case of custom fields, that is
01:44:02
full of functionality. The rest is still
01:44:04
about appearance, for example, here is
01:44:06
this group of styles. bar
01:44:08
we would have format of the bars in
01:44:11
general the format of the bar and the
01:44:15
text of the bar end of task all that
01:44:18
for example if I want to specify even more
01:44:21
here how it will look I
01:44:23
also come to format bar styles for
01:44:26
example for the task all these
01:44:28
positions are tasks, there are also for the
01:44:31
milestones the divisions for the summaries
01:44:33
all of these that we have seen
01:44:36
we can be observing so in
01:44:39
the case of the tasks to be spent the
01:44:41
initial part the central part the
01:44:44
final part for example all the red posts
01:44:47
here a a little less red more orange
01:44:51
and here also a little more green and I say
01:44:55
accept we see how here it would be more
01:44:59
orange and blue very well I'm going to do
01:45:02
control z then for each of the
01:45:04
things you can also change your
01:45:06
last name your appearance and styles of the
01:45:10
the tasks divisions all that is its
01:45:13
shape its color everything that is going to be seen
01:45:15
here we would have very well then I can see
01:45:19
what we had previously indicated
01:45:21
here the critical tasks the ones that we
01:45:24
have not yet finished and are still missing we are almost
01:45:27
on the date we should go to
01:45:30
start at once
01:45:31
and here the delays we see if there are delays or not
01:45:37
the delayed tasks for
01:45:40
example if here task 4 I tell you that
01:45:44
I am going to delay it in this place we have
01:45:47
said here we are going to postpone a
01:45:51
week now when I come and say that I want to see
01:45:55
the delayed tasks and the delays here it
01:45:58
would be indicating
01:46:00
very well task 4 it is also
01:46:03
indicating here it could be control z there
01:46:08
very well as it was then
01:46:11
delayed tasks or for example this one we are going to
01:46:14
see that the task of this date is only
01:46:18
nothing more than
01:46:22
25% of task
01:46:24
4 when I come here the late ones and the
01:46:30
late ones here it will tell me more or
01:46:34
less what all of them are very well I
01:46:37
will leave it there are
01:46:39
too many indicatives it will be
01:46:41
extremely complex then we would have here
01:46:44
the access routes to the task
01:46:48
in this case I could highlight, for
01:46:51
example, the predecessors of the afternoon to 8
01:46:54
which are the ones that precede them here in
01:46:58
this case I click all these are the ones
01:47:01
that precede the 8 here is the 8
01:47:04
well I could also do it you can do
01:47:08
control here
01:47:10
in control z very well I can also
01:47:14
highlight the successors so here
01:47:16
it would be from 8 the one that
01:47:19
follows it would be in this color more or less
01:47:22
purple very well so that way I can
01:47:26
highlight some things or remove the
01:47:28
highlight I'm going to do it leave as it is
01:47:31
being exalted none
01:47:34
in this part we would have here
01:47:37
the baseline so I could
01:47:40
show the baseline what this means
01:47:44
here in project we are going to
01:47:46
establish a baseline later
01:47:48
we are going to see simply that the fact
01:47:50
that the project at At first it is in
01:47:52
a certain way and then over
01:47:55
time it is in another way so
01:47:57
it means that we are going to see the progress
01:48:00
we are going to see which tasks are more or less
01:48:02
eliminated to what extent we have advanced
01:48:04
all of this to come a complete project
01:48:08
I am going to see in view here now if then
01:48:12
I can establish a baseline
01:48:14
means the first of what would be the
01:48:18
and even Carlo I'm going to see tasks
01:48:21
summarizes more no problem
01:48:22
thanks where we have progressed to where
01:48:24
we have progressed I'm going to leave it like this for
01:48:27
those who don't have much conflict at the
01:48:29
time of seeing it then the project
01:48:31
for the moment I say that I am going to establish
01:48:33
a baseline then I say ok it is going to be
01:48:37
baseline 1 the entire project
01:48:40
complete so now this is from
01:48:44
now on this would be how we have started
01:48:47
the project so we are going to make
01:48:50
some modifications for example in
01:48:51
tasks 11 I can insert and even a
01:48:54
task here
01:48:56
a new task base task 12 here
01:49:03
this we are advancing in the project
01:49:06
modifications changes here it will last
01:49:09
more or less about 14 days
01:49:13
it will depend on the task of 16 here
01:49:19
we go Let's search here very well the date
01:49:22
has been automatically adjusted I'm going to see
01:49:25
the complete project here would be the
01:49:26
new task I'm also going to say that it is
01:49:29
in charge Maria very well and now I'm going to
01:49:34
say for example task 8 that has
01:49:37
a progress of one this stands out class is
01:49:41
a progress of 50%
01:49:44
the task here in the evaluation 100%
01:49:49
because it has already passed
01:49:51
here also the evaluation
01:49:53
time I feel it is already and this we are going to
01:49:57
make a delay for example here
01:50:00
in the task
01:50:02
task 8 we can do here we are going to do
01:50:06
the trace
01:50:08
very good we are going to move ahead here
01:50:12
a week and task 7 we are going to delay
01:50:17
here or postpone a week we have
01:50:21
made many changes and modifications
01:50:23
what allows us here is to see the baseline
01:50:26
in comparison to the previous one so here
01:50:29
in view I am going to see the complete project
01:50:32
is telling me the baseline here one
01:50:37
that we have saved today in relation to
01:50:41
the original where it is showing there
01:50:43
what the changes have been modifications
01:50:46
as we see here all this has been happening
01:50:50
if I show even here
01:50:55
we are going to see a diagram of gas here the
01:50:59
tasks summary is now much
01:51:02
better
01:51:04
and I'm going to see the complete project very well
01:51:07
we see how it should be up to here but it
01:51:10
has been extended up to here similarly
01:51:13
this up to here in the original what we
01:51:16
had said the baseline and it has been
01:51:18
extended up to here similarly this
01:51:20
up to here was the baseline now we have
01:51:23
extended up to here so that is what it is
01:51:26
about without someone asking us how
01:51:28
the base of the project is going we are going to say that
01:51:29
at the beginning it was planned up to
01:51:31
this point but we have extended a little
01:51:34
more due to different things that we have
01:51:37
also done here new tasks that
01:51:39
we have added progress and all of this I
01:51:43
am going to come here and
01:51:46
tell you that I no longer want to see this
01:51:47
baseline we are going to leave the project as
01:51:50
it is
01:51:51
then there could also be
01:51:53
delays based on The baseline here
01:51:57
as we see here are the
01:51:59
delays
01:52:01
and some tasks that supposedly we
01:52:04
should have started earlier but
01:52:07
as we see it has
01:52:08
not yet been done so here
01:52:11
we would also have for that then
01:52:14
moving on to the next group it would be more or
01:52:16
less styles and we would continue talking
01:52:18
although this These two are functionality and I
01:52:22
'm going to leave it like this and I can even
01:52:25
deactivate it here too
01:52:28
and I'm even going to come and delete the
01:52:31
baseline that I previously created
01:52:34
very well so that when we have to
01:52:38
explain in the project tab this won't
01:52:40
be there It
01:52:41
is also the same as all the
01:52:43
previous ones, most of the previous ones,
01:52:45
unlike custom fields,
01:52:47
are still in appearance, so we would already
01:52:49
have many styles. I can change
01:52:51
the color as we see
01:52:55
according to my convenience,
01:52:57
so I can choose one of them,
01:53:01
the fact is that I am going to leave it like this
01:53:04
I can also see the number of schemes here as
01:53:07
we see it is not listed so if I say
01:53:09
number of schemes and it would already be
01:53:10
listed this is 1 2 3 4
01:53:15
in the analysis it would be 3.7 let's see if
01:53:20
I can even go through with this which would be
01:53:24
one to a kind of
01:53:27
accumulation separated from phase 3 here
01:53:31
the analysis that would be
01:53:33
periodic tasks although in the end it should not
01:53:36
be it should not have numbering
01:53:38
because they are independent tasks but it is
01:53:41
understood that these are repetitive tasks
01:53:44
so it is already ordered I come here I have
01:53:48
seen the number of scheme
01:53:50
11.1 and this is generally done in
01:53:53
the academic works also
01:53:58
tasks summary of the entire project this
01:54:01
is the entire project
01:54:03
and here I can stop seeing
01:54:06
only the pure and simple tasks
01:54:09
here I could draw but we already have a large
01:54:11
part of the
01:54:13
advanced project if I create a new one
01:54:16
blank then just a couple of
01:54:19
tasks here I would have
01:54:21
task one a duration of about
01:54:25
five days it would start today everything here
01:54:29
then in the gam diagram I could
01:54:32
start drawing arrows here I would have I would
01:54:36
have arcs as we are observing
01:54:41
I could ovals of that shape and many
01:54:45
more things and even text boxes
01:54:48
I click on astro and I put
01:54:52
this is a text box very well
01:54:57
I could also add more things like
01:55:00
rectangle lines here and organize it,
01:55:05
for example if several are
01:55:08
superimposed on the other then here I could
01:55:11
have the front or the front one send to the
01:55:14
background and so
01:55:15
we don't use this much but here anyway,
01:55:20
for example if I want to change the color of
01:55:23
this
01:55:25
to this, which would be an oval, I have here a
01:55:27
drawing properties and I could change here,
01:55:31
for example, those of full can be a
01:55:34
color or in this case a red color or
01:55:39
not so noticeable yellow and the outline here would be red
01:55:43
the red line
01:55:46
very well so now I say accept
01:55:50
we see how yellow and the
01:55:52
red line would be that applies to any of
01:55:54
the I only select elements and I
01:55:57
apply them here in properties very well,
01:55:59
then this whole part would be the
01:56:01
fundamental part of the gang diagram, this
01:56:04
would be the time scale, we will
01:56:06
also be seeing before moving on to
01:56:08
resources, we will now see the
01:56:11
time scale before moving on to resources we are also going to
01:56:14
see a time scale many
01:56:15
times it can be a kind of summary
01:56:17
of everything we are doing
01:56:19
but much more graphic it is like more or
01:56:22
less seeing this and synthesizing it in one
01:56:25
line how we are going to do we have said in
01:56:28
view that we would have a scale of time
01:56:32
I want all the space to be arranged
01:56:34
I click or the right button here
01:56:37
and say time scale so now
01:56:39
I have everything from the time scale and the
01:56:41
contextual tools of the same
01:56:44
previously we had put this I of
01:56:46
course I can delete it
01:56:49
click with the button right remove
01:56:52
time scale this also in
01:56:55
time scale and this other very good then I
01:56:59
would have here to add if I had
01:57:02
phases for example in ga diagram here
01:57:06
we see that I would have three phases without
01:57:10
counting the analysis they are
01:57:12
repetitive tasks so I could also in
01:57:15
that same and that same order organize
01:57:19
the phases and tasks
01:57:21
then again I am going to
01:57:23
right click on the timeline here
01:57:26
therefore we would already have 1 we would need
01:57:30
two more to more or less organize ourselves
01:57:34
by phases then on the timeline
01:57:36
in the contextual tools and I say
01:57:38
add time scale that would be the
01:57:41
second and this third I am going to select
01:57:44
this in the first and then I can
01:57:47
place existing tasks or
01:57:51
otherwise add a new task
01:57:53
directly on the time scale which
01:57:55
is not highly recommended but it is
01:57:58
preferable to do it in the gas diagram
01:57:59
then I'm going to use and I'm going to say from
01:58:02
phase 1 all these tasks without having
01:58:06
evaluation and I say accept where you
01:58:09
get phase 1 and its respective tasks
01:58:13
in case 2 here I can select this
01:58:18
selections from the second I do the same
01:58:21
existing tasks but in this case phase
01:58:24
2 and here the corresponding tasks without
01:58:28
evaluation, accept of course that we can
01:58:31
put evaluation but we are not
01:58:32
putting it so as not to saturate it now
01:58:35
select the next one the third arrived
01:58:37
the same now it would be phase 3
01:58:42
here and its respective tasks
01:58:46
up to the 12 and accept then as we see
01:58:49
from the timeline it is what
01:58:52
interests us most of course that we could change
01:58:54
the styles of the font size
01:58:58
italic color of the letters all that
01:59:01
would be format or similarly here
01:59:04
then a whole selected element
01:59:07
I can change the type of font,
01:59:08
what would interest me the most, for example,
01:59:11
would be by selecting this phase I could
01:59:14
give it a different shade like this one or
01:59:18
a much lighter one like this one I
01:59:21
could even make it much
01:59:23
darker like this
01:59:25
and the color of the text I can say
01:59:28
white
01:59:30
and this much more Of course it would be more or
01:59:33
less like this
01:59:35
simply to be able to see better like
01:59:38
this
01:59:42
and now as we are observing it would be
01:59:44
much more pleasant lying down um and remember
01:59:47
now it looks more complete so I also
01:59:50
do more are
01:59:53
we see how it looks complete the name
01:59:57
I'm going to say it or view complete project and
02:00:01
the same I select this and I can change
02:00:03
respectively all this is phase 1
02:00:06
in which it includes three tasks phase 2
02:00:09
and even so I selected it phase 2
02:00:14
has here four tasks and phase 3
02:00:17
would have every five tasks so how
02:00:20
do we see In a timeline we have been
02:00:22
able to organize it, but if, for example,
02:00:25
from phase 1, I do not want to see this
02:00:27
because it is showing me all
02:00:30
this space in white, it is so that to show all
02:00:33
this I only want it to show me the phase
02:00:35
only and the corresponding dates
02:00:38
so since I already have the
02:00:40
date ranges I could do it I can even
02:00:44
get a little closer
02:00:46
we said there the first of the cases
02:00:50
and even a little more
02:00:52
there approximately we are
02:00:55
focusing on this so I select
02:00:58
I click with the right button here in
02:01:01
this space blank and I go out of dates
02:01:03
and I'm going to say establish it because the
02:01:06
beginning would be here this would be the
02:01:10
first approximately here the first
02:01:13
of April so I have here the first
02:01:17
of April
02:01:19
and it will end
02:01:21
here it shows me
02:01:23
approximately April 26th and even
02:01:28
I said a little closer, it's
02:01:30
letting me see it there now it
02:01:36
looks much better
02:01:38
it would be the 25th actually so I
02:01:42
'm going to leave it like this
02:01:44
the date range
02:01:47
I'm going to use the first of April in
02:01:50
this case it's the first of April the
02:01:52
beginning and here April 25 very good
02:01:58
even one more day no problem I can
02:02:01
put the 26th and I say accept this there is one
02:02:04
day also no problem it is not much
02:02:07
if you want it to be exactly up to here
02:02:10
then again I click with the
02:02:12
right button a range of dates and I say
02:02:15
instead of 26 25 and now and up to the level
02:02:19
and the same would happen with these others
02:02:21
so here
02:02:25
it would be
02:02:27
until more or less here until 26
02:02:33
23 in this case from April 26
02:02:40
to June 23 then the same
02:02:43
I right click on the
02:02:45
date range and set let's go here
02:02:51
I can say from April 26
02:02:57
to him
02:03:00
we have said until June
02:03:03
until June 23
02:03:06
I say accept then as we see here
02:03:10
it is in Castile exactly as
02:03:12
we want it to be where the phase ends
02:03:14
will begin begins the next one and so on
02:03:17
here we could do the same I'm going to
02:03:21
insert I'm going to bring it a little closer and
02:03:25
this one starts on June 24 in this
02:03:30
case actually from June until the
02:03:35
5th we're going to see here the last last date
02:03:38
would be here the 12th until On
02:03:44
September 12, we'll see if you'll let me
02:03:46
see, so let's get a little closer.
02:03:49
Arm me very well. It's there, approximately,
02:03:53
right-click a range of
02:03:56
dates and I'm going to set the start to be
02:04:00
the
02:04:02
4th here from
02:04:05
June 24th
02:04:09
to September 12
02:04:14
until the 12th of the sense of accepting we see
02:04:18
how we have already distinguished
02:04:21
in view the complete project and here
02:04:24
logically we can change as
02:04:26
previously we said here a
02:04:29
different shade of green for the task
02:04:34
different lighter green
02:04:36
that is only to give nothing more than the
02:04:39
appearance that is see much better
02:04:43
here similarly we could make one
02:04:47
that is orange in the iv and each
02:04:52
of these that is a usual orange
02:04:54
so here
02:04:59
a soft orange as we see
02:05:02
even the text does not show white I
02:05:05
can put it here also white very well
02:05:08
so this is a timeline
02:05:10
if you get closer if you zoom in we will
02:05:12
have more details of the
02:05:14
start and end dates so we can
02:05:18
present this to know what date
02:05:20
phase 1 is going to start and what date
02:05:23
the tasks corresponding to it will finish
02:05:25
each of the phases and their
02:05:28
corresponding dates then this is the
02:05:31
time scale now if I come here
02:05:34
to the gang diagram and also in the
02:05:37
time scale in active view we see that as
02:05:41
all these tasks are being reflected
02:05:43
perfectly at the top
02:05:45
then I I could navigate within the
02:05:48
time scale,
02:05:50
we have done all this in three
02:05:53
levels,
02:05:54
let's say time scale, we
02:05:58
would have done it in just one, but here it is
02:06:01
seen more aesthetically in the
02:06:02
separations,
02:06:05
for example, I could have added it in
02:06:07
a time scale and here in that same one
02:06:10
I would have put, for example, everything that
02:06:13
would be the entire project or phase 1
02:06:17
phase 2 as this phase 3 and accept
02:06:21
then that I would do it here
02:06:25
but since they are already busy I could
02:06:28
eliminate all of these we are going to remove the
02:06:32
time scale this too
02:06:36
we are going to remove this similarly
02:06:42
this also
02:06:44
remove time scale
02:06:47
this similarly
02:06:49
and now here existing tasks phase 1
02:06:53
all the tasks
02:06:55
without the evaluations we are putting it
02:07:00
here phase 3 also
02:07:05
very well and now I say to accept we see
02:07:09
that only one has put it to me
02:07:12
If we look at the top, the
02:07:15
tasks are all corresponding, the
02:07:17
phases too, but it is at the same level
02:07:20
as this, only that we would have
02:07:22
wanted, as previously, we have
02:07:24
organized below, so I can
02:07:26
try to organize much more below
02:07:29
there, not so much there, and lower them, just
02:07:35
the same. with this much further down
02:07:40
and all like this
02:07:43
then as we observe phase one
02:07:47
it begins here it ends here this is the
02:07:50
same let's say done that a moment ago
02:07:52
right click
02:07:54
here
02:07:55
or try to show only when they
02:07:59
begin to measure themselves
02:08:01
that logically from phase 2
02:08:03
corresponds after phase 1 let's
02:08:06
see here the tasks will be on the
02:08:08
corresponding dates
02:08:11
the start dates are probably not
02:08:13
configured correctly here in
02:08:16
the gas diagram for example this
02:08:19
tells me that the first starts and
02:08:22
the first does not start here
02:08:24
this starts on 26 then I
02:08:28
would put 26 here
02:08:32
very well and it ends at 18 I'm going to see here it
02:08:37
would end at 23 so it is not
02:08:40
correct either because this is not
02:08:42
correct because if we look
02:08:44
here we had put it manually and
02:08:48
automatically so if
02:08:51
automatically it tries to recover the
02:08:53
previous dates very well this evaluation for
02:08:57
example could be after the
02:09:00
independent task or a milestone so
02:09:04
here it is agreed as and it would be I'm
02:09:07
going to leave it so I can
02:09:10
put this manually so that it starts
02:09:12
exactly here
02:09:15
the 23rd would be fine here but the start
02:09:20
It's not good, so we're going to say that
02:09:23
it would start on the first one, not here, in April,
02:09:27
very good, now it would be correct here,
02:09:31
too. Phase 3 would
02:09:34
start on June 26, June 24, so
02:09:40
I'm looking for June on
02:09:44
June 24 and it ends on the 5th, here I'm
02:09:50
not going to say
02:09:53
in this case on the 12th on
02:09:57
September 12 very good so I
02:10:00
'm going to put it here
02:10:03
September on
02:10:07
the 12th very good I'm going to save it
02:10:11
if I come to the time scale we see that it
02:10:15
would already be correctly this I simply
02:10:17
dragged it there
02:10:19
and even much lower yes I want
02:10:23
it I'll go to save this it would be
02:10:25
correct this keeps telling me that
02:10:27
the first one is going to start I can correct it
02:10:30
come to the gas diagram it
02:10:32
keeps telling me that the first one is going to start it
02:10:34
is going to start on the 20th and 26th we have
02:10:38
said April
02:10:40
very well
02:10:42
and now it is
02:10:44
escalating of time we will see and
02:10:46
it would be correct then I
02:10:49
simply lower it or even there
02:10:52
I can keep it all in a line
02:10:56
until there this also if I wish very well
02:11:00
then we have to be careful with
02:11:02
the dates that have been moved here as
02:11:04
we observe many of us have advanced
02:11:06
tasks We have delayed all this from the
02:11:08
timeline. We are going to organize it
02:11:10
as we wanted much further back. We have
02:11:14
shown in the phases in different
02:11:17
lines, so that was a little more
02:11:20
convenient than this here. We have to
02:11:23
take this into account very well, so
02:11:26
in that way. is set on the
02:11:29
timeline let's see now what
02:11:31
this resource tab would be we're going to
02:11:35
follow the same as instead of seeing
02:11:37
the gang diagram at the bottom
02:11:38
here we would have for the resource sheet
02:11:41
or the same thing we have said in view what I
02:11:44
was looking at resource sheet either of the
02:11:45
two is valid and even
02:11:48
right click here we would also have
02:11:50
course sheet here at the bottom
02:11:54
two days it is enabled very well
02:11:57
we would have the resources that we
02:11:59
have only used while doing the example no We have
02:12:02
specified the same here as
02:12:05
we do add tasks
02:12:07
we had to choose where courses we are going to
02:12:11
see if it will let me delete these because they would already
02:12:13
be linked to others so I
02:12:16
right click and I can
02:12:18
delete from the course
02:12:19
similarly I am going to delete this one from
02:12:23
course if I come here we see that now
02:12:26
we would not have any task associated with
02:12:29
any of the course what type of resource is
02:12:32
going to be managed in project would be these
02:12:36
here then we would have the work ones
02:12:39
in which
02:12:42
human resources and technical resources are found with these
02:12:46
human resources They will be the people who
02:12:47
are going to do the work, generally
02:12:49
eight hours a day, and the
02:12:52
technical resources such as the equipment. In
02:12:54
our case, we could do
02:12:57
an example with computers, things like that
02:13:00
within a system that we are
02:13:03
making an application for an
02:13:06
entire project, very well, then
02:13:08
materials. They are based on
02:13:10
consumable elements such as sheets, for example, in
02:13:13
our case, photocopies, printing, the
02:13:16
folder, pen, all of that and costs, they are
02:13:19
resources that have a final cost and that does
02:13:21
not depend on the quality, in this case, on
02:13:24
the quantity of work, its duration, such
02:13:26
as travel expenses. or food
02:13:28
accommodation then we are going to do an
02:13:31
example with each of these in the first
02:13:34
instance we can put here let's
02:13:36
not forget that we can put several
02:13:38
resources
02:13:39
in this table it will give us here the name
02:13:42
of the resource of the type this type is the
02:13:45
one we just indicated then different
02:13:48
labels, for example, here are the labels,
02:13:51
the
02:13:52
material, the initials of the group, we are going to
02:13:56
understand each one of this measure that
02:13:58
we are going to add, so very well, I am going to
02:14:00
place in the first instance here what we
02:14:04
had indicated in this part of
02:14:07
the first element,
02:14:10
let's see it here about work then I
02:14:15
'm going to insert a work one I
02:14:19
can put
02:14:21
anna
02:14:23
gonzález
02:14:25
has automatically detected that it would be a
02:14:27
work one in the work one we have
02:14:29
specified that there would be
02:14:32
human resources and technical resources and then
02:14:35
it would be from there in labels in this case
02:14:39
of non-material We would have to take it out, I'm going to
02:14:42
run a little more, this doesn't
02:14:45
exactly correspond to what a human resource would be,
02:14:49
so the material label
02:14:52
here we wouldn't be looking at per kilo quintal
02:14:56
to the bag per package, none of that,
02:15:00
so since it's a work resource,
02:15:03
it came in, we're going to do it. to leave that
02:15:04
initial form it tells me 4 - so that
02:15:08
anyone can realize directly the initial of the name or a
02:15:12
kind of systematization of the name
02:15:13
then I can put angel that they would be
02:15:16
gonzález
02:15:17
I'm going to press
02:15:19
then in group here I can create a
02:15:23
group so that go there all these
02:15:27
types of
02:15:28
resources so I'm going to say the
02:15:31
course gene key I'm going to say it
02:15:34
is
02:15:36
the operational team so we could have
02:15:40
put two
02:15:42
graphic designers programmers systems analysts the
02:15:46
entire second cumulative group but
02:15:49
we are encompassing everyone they in
02:15:52
operation for the capacity yes it is
02:15:55
important here he tells me one hundred
02:15:58
percent it means that eight hours a day
02:16:00
if I put in 50% four hours a day
02:16:04
at home
02:16:06
this would be how much he earns for now and this
02:16:08
overtime then I will even go so
02:16:12
that it can be seen better I'm going to do like this
02:16:15
this would be labels I'm going to put it
02:16:18
that way
02:16:20
a little more
02:16:22
we want to see in a better way this there are
02:16:27
works here you are now and this one does day
02:16:33
and standard and it's overtime so
02:16:37
now you can see
02:16:38
how much I can put to the one Earn
02:16:42
15 dollars for now, for example, it could be,
02:16:45
then I'm going to put it at 15 per hour and overtime is
02:16:51
generally charged double. I'm going to put it at
02:16:53
30. It depends on the country. I'm going to put it at
02:16:56
simply
02:16:57
30
02:16:59
and here it costs per use since it's not something
02:17:03
we're going to be using. as a
02:17:06
technical resource, for example in
02:17:08
equipment, a computer, we
02:17:10
leave it like this
02:17:12
and I can even do this like this here
02:17:15
as well as the accumulation of code and
02:17:20
from here I can add more
02:17:21
columns but up to this point
02:17:23
the type of payment that is going would be by default to
02:17:26
do can be at the beginning of the work at the
02:17:30
end of the work or in proration
02:17:33
which as the work goes on will be
02:17:35
disbursed we will leave this in
02:17:38
proration the calendar there are several
02:17:41
calendars that are used here the
02:17:44
standard 24 hour calendar and generally We are
02:17:46
working in standard and we can even
02:17:49
create our own calendar, we are going to
02:17:51
leave it the standard
02:17:54
and just as there are some initials here
02:17:57
so that we can realize it without the need
02:17:59
for the name to be complete, then
02:18:02
I can still put a code here for
02:18:04
example for all the which would be the
02:18:07
operative one or for González I could put
02:18:09
one side here and here it would be operative or
02:18:15
it could be one so it will depend on
02:18:19
us in this case not to complicate
02:18:21
the code is like a kind of
02:18:24
Haiti I'm going to leave it so free I could
02:18:28
put another more simply to
02:18:29
exemplify when we come here we
02:18:31
would already have one if I come to the part of
02:18:35
ghana calligram of gun when I come to
02:18:37
resources I click on this small
02:18:39
option and the one I just added would already have one
02:18:41
so I'm going to return
02:18:44
again and I'm going to put here
02:18:48
jose fernandez
02:18:51
this is also working label
02:18:54
we have not said that we do not need can I
02:18:56
put it here I am going to take it out like this and the efe
02:19:02
josé fernandez is the group also
02:19:05
operational
02:19:08
the capacity is at 100%
02:19:11
they have the same functionality as the
02:19:13
previous person so also in the
02:19:15
same amount
02:19:18
and also overtime on the 30th
02:19:24
and everything else he told her how it is
02:19:26
I can even put a couple more here I'm going
02:19:31
to put it
02:19:33
Vanessa Mendoza
02:19:37
work
02:19:38
I'm going to leave it here Vanessa Mendoza
02:19:43
is also an operative
02:19:47
of that group belongs
02:19:50
capacity 15 here 30 and The rest of us then
02:19:55
see that we have added 3 here I
02:19:58
can also put 1 like Alex
02:20:03
his shouts
02:20:05
work
02:20:07
here I can put it to Alex sudden
02:20:12
operational
02:20:17
and here at 100% 15
02:20:21
30 and the others leave it very well we see
02:20:24
that since they are the same group
02:20:26
so this day appropriately here
02:20:29
I am going to say that a kind of
02:20:32
administrative I am going to put
02:20:37
interested
02:20:39
Aguilar
02:20:41
this would also be a job here I can
02:20:44
abbreviate what Teresa Aguilar this would be an
02:20:48
administrative
02:20:51
capacity this person earns double
02:20:55
we are going to say that it would be 30
02:21:00
an hour and here he would earn 60 overtime and
02:21:04
everything else we leave this is an
02:21:06
administrative very good as we see this
02:21:08
all of these are now available
02:21:11
I'm going to save it I'm going to come now
02:21:14
when we do the resource allocation here
02:21:16
all of these would be very good I'm
02:21:19
going to return now to resources later
02:21:23
I can continue adding but you are no longer
02:21:26
working so let's put in a
02:21:28
technical resource let's realize that
02:21:31
we are going to need to rent a
02:21:34
server that is, where the information that corresponds to the cloud will be stored
02:21:37
in exchange with the web server stored
02:21:44
then All our data will be
02:21:46
installed and generally we also pay
02:21:48
per hour.
02:21:51
This is not going to charge us per
02:21:53
transfer, but more or less for now,
02:21:56
so I am going to put it on each web server.
02:22:00
This is not a group. It could be a
02:22:03
group. It is going to be technical. So a
02:22:06
technical resource
02:22:08
here with capacity, we could also put one
02:22:11
hundred percent to work
02:22:13
full time and what he is going to rent us for
02:22:16
now would be approximately five
02:22:20
dollars an hour, so we are going to put
02:22:24
overtime here, I wouldn't have a single one and
02:22:28
everything others and even this we would pay at the
02:22:31
beginning very well
02:22:34
as we see all these would be
02:22:36
work resources and worker resources
02:22:39
we are going to put material resources for
02:22:42
example then these are used
02:22:45
only once
02:22:47
so I am going to put
02:22:49
stationery
02:22:55
very well
02:22:57
this would no longer be of work this would be
02:22:59
material
02:23:01
and
02:23:03
and we will buy a package so this
02:23:06
can be here if we need a
02:23:09
label therefore it can be here per
02:23:12
unit
02:23:16
very well then to the unit of the
02:23:19
package or package I can put it comes
02:23:23
sheets eraser notebook and a pen and
02:23:29
a pencil then it is a whole package
02:23:31
that you give us here I can put stationery
02:23:36
then this would be in the group this of the
02:23:40
group I could leave it free now I
02:23:43
can also put it under a group like this
02:23:46
they would be stationery very well the
02:23:49
capacity
02:23:50
here does not apply the standard rate if it I'm going
02:23:55
to say that more or less it costs about 50
02:23:58
dollars,
02:23:59
very well,
02:24:01
the others do not apply to almost the way in
02:24:05
which we are going to charge, so it can
02:24:08
be proration or paying at the beginning,
02:24:11
also very good, so these are
02:24:13
work resources, human and
02:24:17
technical resources, we have said. up to now this
02:24:19
would be the material and now a
02:24:23
cost resource so here we are going to
02:24:26
realize that it is a meeting that meeting
02:24:30
takes place in a specific place every
02:24:33
Friday something like that is that cost day
02:24:37
so now I could put here
02:24:40
label the initials do not apply I could
02:24:44
put meetings is good and the group here
02:24:49
I can put management not
02:24:53
very well enter then none of these
02:24:57
applies directly to boyacá to prostate
02:25:00
so yes it would be good
02:25:02
and it is even a little I can
02:25:04
go through it now we would see that
02:25:06
we would have all our
02:25:08
basic resources here everything we finished To
02:25:11
add, we could have also done it
02:25:13
from here, for example, add resources
02:25:15
from here, we have said the
02:25:17
material work one, the cost one, so when
02:25:19
I am here or wherever I say add a
02:25:22
cost material directly, it added me
02:25:25
here where I was and
02:25:28
the guy put it in. cost I am going to do
02:25:30
control if then we had used
02:25:32
this or this and the three types of resources
02:25:36
then the groups here we would also have
02:25:40
this it would be especially when there are
02:25:42
several projects in one
02:25:46
this let's not forget that they are simply
02:25:47
the views the same as clicking
02:25:49
the button right here these views
02:25:52
so this field may have
02:25:54
changed and I can even come to the
02:25:57
gang diagram and see here in resources I
02:26:00
can now assign all of these I will
02:26:04
return here
02:26:07
and in the course sheet part very well
02:26:11
we follow the resources then if I do
02:26:14
For example, click on Vanessa Mendoza. I click
02:26:16
on information. It gives me all the information
02:26:20
about it. Here the initials which group it
02:26:23
is in. We haven't put it in the code. The type
02:26:26
of resource that belongs to this person. I can
02:26:29
put their email
02:26:31
and here the availability of resources and
02:26:34
it would be one hundred percent the costs
02:26:37
some note is that I could put some
02:26:40
custom fields we
02:26:43
don't have custom fields we are
02:26:44
going to leave it like this you can add a note
02:26:47
where I am here in vanessa
02:26:49
mendoza so here I could have
02:26:51
added a note or here it also doesn't
02:26:53
matter and I put This is a
02:26:58
specific note from this resource and I say to
02:27:03
accept on the left side here it
02:27:06
shows me a symbol and summarizes the note
02:27:10
so the next time you enter
02:27:11
information in notes it would be here very
02:27:14
well then in details also at the
02:27:17
bottom it will the
02:27:20
details of the previous resource in question appear here
02:27:23
when we have inserted it into the
02:27:26
gun diagram here it did not show us the
02:27:28
resource as such but the task so
02:27:32
I am going to deactivate details if I come here
02:27:34
andy the wood positions me in the task
02:27:38
for example 1 and I am going to assign it here by
02:27:41
álex sur and it is very good now when I
02:27:45
come to details in this case it can be
02:27:49
here to tasks and I am going to see the details
02:27:52
here
02:27:54
at the bottom the resource tells me
02:27:56
that if it is assigned how many hours here
02:28:00
everything everything necessary the information
02:28:03
but only about the task
02:28:05
so we have to take that into account
02:28:08
very well in view I can also say
02:28:11
that I do not want details but since
02:28:14
we were working here there is a part
02:28:16
here I can also put a
02:28:18
resource sheet so the details
02:28:22
here of resources
02:28:24
would be for each one of these chosen for
02:28:28
example of interest to their details
02:28:31
and this is for the distribution of
02:28:34
resources so I can distribute all
02:28:37
the resources accordingly this
02:28:40
is especially to
02:28:42
avoid overallocation if
02:28:46
I come to the gun diagram for example let's not
02:28:49
forget that here I can put all the
02:28:50
resources that we have created, I can put it,
02:28:52
let's put an example here in the
02:28:56
task, for example
02:28:58
13 and in 13-14, if we see
02:29:02
simultaneously, both of them start at the
02:29:05
same time, it is one, they are two
02:29:08
simultaneous tasks, if they are related, when one
02:29:12
starts, one also starts. the other one
02:29:14
so I can't assign the same
02:29:17
resource for two people so from here
02:29:20
for example I can say to take
02:29:24
charge here jose
02:29:27
fernandes very good I click outside
02:29:29
here also josé fernández has clicked
02:29:32
outside here it is with red it means there
02:29:35
is an overallocation to a single
02:29:38
person I am giving him two jobs two
02:29:40
different tasks where this is going to be
02:29:42
difficult for him so here
02:29:45
in the courses tab I can say
02:29:46
distribute this is the course where I
02:29:48
am now or of all the ones that
02:29:51
would be in conflict here he tells me that
02:29:53
there is a conflict I
02:29:55
can tell him distribute he tells me very
02:29:58
well which one is in conflict
02:30:00
now is Jose Fernandez I tell him
02:30:02
distribute now we see how time has changed
02:30:04
when one task ends
02:30:09
the other begins like this if I had had
02:30:12
several conflicts well used this
02:30:14
option
02:30:15
we are in the resources tab I
02:30:17
click we see how they solved it for me
02:30:19
immediately very well here
02:30:22
I could see the distribution options
02:30:25
to see these conflicts or delete
02:30:28
them or go to the
02:30:30
next overallocation when I go to analyze one by one,
02:30:33
then in this case I am going to
02:30:36
say everything, my problem would be
02:30:39
solved, let's see this where the
02:30:42
reports, then the report will allow us to
02:30:46
directly see the results of everything we
02:30:49
have done about the project and what
02:30:52
we could print or export or send it
02:30:55
by email then here
02:30:57
I would have a new report I could do it
02:30:59
from scratch let's not forget that this is to
02:31:01
buy
02:31:02
projects here I can start blank and
02:31:06
add according to my needs it
02:31:08
cannot be graphically using tables or
02:31:11
by comparison if I say blank
02:31:13
it tells me how The report is going to be called and
02:31:16
I am going to say report 1
02:31:18
then I say accept and the
02:31:22
design of the report would be ready and I can go here
02:31:23
starting
02:31:25
to see what things it is going to insert and what
02:31:27
things not so from the Ghana diagram
02:31:29
here we will be seeing
02:31:32
I can start inserting images here let's
02:31:35
not forget that all of these would be about
02:31:37
themes colors types of fonts line
02:31:40
spacing all of that so we do
02:31:43
n't touch it it is quite well
02:31:45
configured I can vary it but
02:31:48
the Arabs try to make it very
02:31:51
exaggerated in terms of colors you can
02:31:54
insert images
02:31:56
from my computer I can search a
02:31:59
related image,
02:32:01
for example, insert as we are
02:32:04
observing,
02:32:05
I could also here insert shapes of
02:32:09
all the ones we have here, if
02:32:11
I want a triangle, you can insert a
02:32:14
triangle,
02:32:15
you can insert graphics here, I say
02:32:19
accept and start to see which graphics,
02:32:22
for example, it has automatically
02:32:24
collected from the phase 1 here from phase
02:32:27
2 and phase 3 as well as the analysis and
02:32:31
in this part I would decide what things to see
02:32:33
and what things not to filter everything is
02:32:37
2000 for I am building it and
02:32:40
I will even be able to change the type of graph
02:32:42
of it very well and I can also here I
02:32:46
'm going to select and delete and put
02:32:49
tables here for example of the project
02:32:53
when it starts when it ends the
02:32:55
percentage of completion of it
02:32:58
then I'm going to select everything here I'm going to
02:33:03
delete the text boxes I
02:33:06
click and create a text box and I say
02:33:08
this
02:33:10
is a text box what is
02:33:13
this for because word is different in word
02:33:17
we directly insert the text and
02:33:19
start transcribing here I am not going to
02:33:21
need a text box and
02:33:23
transcribe my text using boxes
02:33:26
we are going to move where we who
02:33:28
were cannot put here plainly or
02:33:32
what would be text you cannot write
02:33:35
directly I need to insert a
02:33:39
text box very well here in manage
02:33:42
change the name of the report for
02:33:44
example copy a report from others that we
02:33:47
already have can generate when it is a
02:33:50
very long report a page break
02:33:52
From a certain point on, the size of
02:33:56
the sheet is configured here,
02:33:58
the orientation is also vertical or
02:34:00
horizontal, I can set it vertically, the
02:34:04
margins can also be set to normal,
02:34:07
when, for example, I generate a report
02:34:10
like that nearby and also a table at the
02:34:15
bottom as we have indicated like this you
02:34:18
could go all the way down here I
02:34:21
can say it is going to be called
02:34:24
report summary and I can put more text we have
02:34:28
indicated
02:34:29
all this I am going to do control z I can
02:34:32
go through this here
02:34:35
and this much further down also go through
02:34:38
with the vertical scroll and go through this
02:34:42
too
02:34:43
there and I can put another title here, for
02:34:47
example, text box, I click,
02:34:50
drag and say
02:34:53
here
02:34:54
summary and I can configure it with what
02:34:58
corresponds here with the form and the
02:35:02
form format, the color from full,
02:35:05
I can change all of that here or the
02:35:08
report design So I can
02:35:10
leave it as it is
02:35:12
and even in the task here I could use it
02:35:15
to change the text color. All of that is
02:35:18
very good. I can't leave it like this.
02:35:22
This can also fill it, so what
02:35:25
interests me now would be the structure.
02:35:28
Control p was pressed to print, we see
02:35:30
how everything It would be on the right side not in the
02:35:33
center so it is occupying two pages
02:35:36
therefore it would have to go further to the
02:35:39
left here as it is very far to the right
02:35:43
further to the left
02:35:45
there
02:35:47
this summary
02:35:51
would also have to be placed much further to the
02:35:53
left there and this
02:35:56
until There now when you pressed control p
02:36:00
we see how it would already be, even so it is
02:36:03
leaving out a little from what
02:36:06
this area and the top would be
02:36:10
and I am going to press escape this we see that it is
02:36:13
a text box I simply make it
02:36:15
smaller like this
02:36:17
like here at the bottom I
02:36:19
don't need so much space this I can
02:36:23
go through it like that
02:36:24
that too like that
02:36:27
and this is similarly I put it here and I'm
02:36:30
going to pick it up let's see if it lets me
02:36:35
pick up a little bit now when
02:36:38
I pressed control pe and it would be on a single
02:36:40
sheet My report here is uniform and
02:36:44
the summary I can put all the titles
02:36:46
I want and directly to
02:36:49
print we see that it is not complicated at all You
02:36:53
could also generate another
02:36:55
separate report apart from this one which would be
02:36:57
report 1 I am going to save it I can generate
02:37:02
a new one report then one with
02:37:04
graphics that you bring it to me based on
02:37:07
all the data that we are managing
02:37:09
here that you bring it ready to me then here I
02:37:14
am going to return to this
02:37:17
blank report I am going to come here to the
02:37:20
report area and new report with graphics
02:37:23
then it goes to say report 2
02:37:27
accept and this is a new report now it
02:37:30
has brought me other graphs based on what
02:37:33
we have another way it would be here
02:37:38
an accounting report to us in this
02:37:41
blank that we have created we have combined
02:37:42
this and this other
02:37:45
9
02:37:47
I am going to change
02:37:50
from this place from the
02:37:52
reports part here I am going to come to report 1 to
02:37:56
spend and the report we would also have
02:37:59
the other or more reports for example
02:38:03
report 2 here I have and report 1
02:38:07
very well then here I would have separately
02:38:10
I could generate a complete report
02:38:13
here from costs of the project or work,
02:38:17
if I say about the project, this is a new
02:38:19
report, here you press control, for the
02:38:23
same reason that the file has come to print and
02:38:26
here there would then be a whole sheet of
02:38:28
general information about the project and if
02:38:31
we see we would have a lot of data such as the
02:38:33
percentage completed the evaluations
02:38:37
pence here expiration of milestones clear the
02:38:41
degree of completion of the different
02:38:44
phases 1 2 3 as we see and here we would have
02:38:47
much more data very well so
02:38:52
we could also do it that way
02:38:54
others would be let's forget that these
02:38:57
are still completely avoidable text boxes
02:39:01
I can change them move them
02:39:04
do everything so each one of these I
02:39:07
move as I like it does not have to
02:39:10
stay permanently I can
02:39:12
change
02:39:13
alter the others a report would
02:39:17
also be a report not only of the
02:39:19
project but of the work how the
02:39:21
work is going how many hours it really is
02:39:24
quite convenient to work on it so it was
02:39:26
tightened the control p here we would have and
02:39:29
we have said here it will continue
02:39:31
exactly from here from line down this
02:39:37
is the sheet the first is the second
02:39:39
we have also said that here we can
02:39:41
change the size of the sheet and the
02:39:43
orientation is horizontal and it is
02:39:46
A4 size very well and you can also
02:39:50
insert if I want a title a
02:39:52
text box and I go all the rest
02:39:53
arranging and reorganizing all the
02:39:56
information that I just launched the
02:39:58
report here I would also have
02:40:02
resource reports here on assigned costs
02:40:07
cash flow in progress the two
02:40:11
critical tasks and many more things then and I
02:40:15
even have visual reports to be
02:40:17
able to export it in a
02:40:18
different format such as excel or vice
02:40:23
from here I could export my reports and
02:40:26
then basically it is that there is nothing
02:40:28
complicated in it let's see now
02:40:31
finally this project here we are going to
02:40:34
be able to add more projects to an existing one
02:40:37
with us in view when we had
02:40:40
here or in a gang diagram
02:40:44
project summary task here this of the
02:40:45
general project
02:40:47
but I could also add more and
02:40:50
more projects to the existing one here are
02:40:52
some plugins that we could
02:40:54
use at the same time we do it here this
02:40:58
project information here
02:41:00
start date and current date and the end date
02:41:06
will be modified as
02:41:08
we add tasks
02:41:11
the status for example I can say up to
02:41:15
here more or less up to him
02:41:18
29 well established would be enough the project
02:41:22
the progress then here schedule from
02:41:26
the beginning of the project or
02:41:29
end date of the project then we will
02:41:31
always schedule from the
02:41:33
beginning this calendar thing is
02:41:35
extremely important because here
02:41:38
we would have three calendars always the
02:41:40
project we have to associate with a
02:41:42
consecutive calendar let's Let's see how to
02:41:44
add a calendar here but
02:41:46
basically you can choose and customize
02:41:49
my own calendar in priority
02:41:52
based on other projects that we are going to
02:41:53
associate as your projects because the higher the
02:41:57
number here, the higher the priority
02:42:00
then you could see custom fields here
02:42:03
and all that basically
02:42:04
this is what constitutes the project the
02:42:08
information in custom fields
02:42:11
previously we have already seen how to
02:42:12
add our own
02:42:14
custom field here change the name all
02:42:17
that we have already seen later this is
02:42:20
related to your projects or to linked projects
02:42:24
we have seen only a single project
02:42:26
we have not linked several projects Another
02:42:30
thing would be that here I can define
02:42:32
a code just like we have said that we
02:42:35
could add a new row or here
02:42:38
let's see in a
02:42:41
graph view of a large schema number here
02:42:44
I would have the schema number and also
02:42:47
each of the resources had its own
02:42:50
code we can also put
02:42:52
for each of the tasks here in the
02:42:55
project I'm going to remove this
02:42:58
here in the project
02:43:01
we can add our own code to
02:43:03
taste I'm going to maximize again
02:43:06
so if I come here
02:43:10
I can apart from these existing ones add
02:43:13
another one here then it would be as It would
02:43:17
also be here dt the same as this one and I
02:43:21
click and this would be the code
02:43:24
logically that I can pick it up
02:43:27
to the left so I can drag it
02:43:30
even more up to here this your
02:43:33
code we see
02:43:38
11.11.28 mylar to this that was here in
02:43:41
the large diagram scheme number
02:43:44
11.1 are more or less the equivalent of a
02:43:49
code
02:43:50
this will allow us to know the position
02:43:53
of each of the elements so
02:43:56
if I don't need this then here
02:44:00
I can activate the scheme number it would be
02:44:02
very similar or I can customize it here
02:44:06
in the project I come and I say define the
02:44:08
code as I want, not as it is here,
02:44:11
so you can establish my own
02:44:13
code, for example, a prefix can be
02:44:16
and
02:44:19
hyphen and I can put one here, for example,
02:44:24
or it just says nothing more than and I and here
02:44:28
the sequence of numbers is like this. you will
02:44:31
see Johnny here
02:44:34
123 1.1 here not only
02:44:38
uppercase numbers also so you can see
02:44:41
instead of the one that is already pre-established or
02:44:44
lowercase here or treasure characters here
02:44:48
disordered for example if I put it
02:44:51
in order and say to accept here we see
02:44:53
how it has already changed
02:44:55
it would be and 1 and 1.1 then my own
02:45:00
coding of all this if I don't
02:45:03
want to see this about numbers I'm only going
02:45:05
to see nothing more than the coding to
02:45:07
know how to organize much better then
02:45:09
it is in the project here in this place then
02:45:13
here I said change work time is
02:45:16
where We would have to organize our
02:45:18
calendar that we
02:45:20
have used here, we could use
02:45:23
all these 24-hour calendars,
02:45:26
night shift and standard,
02:45:28
so I do want to keep my own
02:45:31
calendar with what days
02:45:35
they are going to work
02:45:37
and to work holidays or there is an
02:45:40
anniversary, all of that I can create my
02:45:42
own calendar, we see here, for example,
02:45:44
that it is blank, these are working days,
02:45:47
these here are non-working days, they are these
02:45:50
gray ones
02:45:53
here, working hours that can be modified
02:45:56
as we go to modify here, then we will
02:45:58
see exception days with this
02:46:01
color. to show and this yellow
02:46:03
non-default work week
02:46:07
then I create mine I say very well
02:46:10
based on a standard calendar
02:46:13
then I can say create a new
02:46:16
base calendar and here I say I'm going to say
02:46:19
my calendar
02:46:23
very well and it will copy the same
02:46:25
characteristics of standard or create a
02:46:28
completely clean one if I say this it will
02:46:31
resume the holidays on
02:46:34
Saturdays and Sundays that do not work if
02:46:36
I say here I am going to have to customize
02:46:39
those days
02:46:41
I say accept now it would already be in my
02:46:43
calendar
02:46:45
so I am going to establish here in the
02:46:47
second tab the working days
02:46:50
so here I can leave it as
02:46:53
default when it starts and when it
02:46:57
ends
02:46:59
then here in details I can come and
02:47:02
say that I am going to set the
02:47:04
working days so Monday to Friday and
02:47:09
Monday to Friday from now to
02:47:11
what time I can say from here I am going to
02:47:14
establish from 8 o'clock
02:47:17
so I can say from 08 00
02:47:23
and until we are
02:47:26
going to put 1200 then they go to lunch they
02:47:30
come back and from 13 o'clock
02:47:34
here we are going to put two points 0 0 until
02:47:39
17 o'clock here
02:47:43
no no it is set to 1700 so I say
02:47:46
accept and it would practically be
02:47:50
established on weekdays the
02:47:53
exceptions I can also put here, for
02:47:55
example,
02:47:59
his day, we are going to put a special fair day
02:48:02
to give them free time so they can go be
02:48:03
with their children and here I can
02:48:06
say 12 April in Bolivia is
02:48:09
Children's Day so you will not work
02:48:12
until the same day, a single day will
02:48:15
last the same therefore here the 12th
02:48:20
stands out this will be the day that
02:48:24
practically you will not work
02:48:27
so I say accept now When I come
02:48:31
to the project report in the calendar
02:48:34
that I am going to use and I can now
02:48:35
customize my calendar with all the
02:48:38
exceptions of the days that are not going to be
02:48:40
worked
02:48:41
and I say accept very well then I am going to
02:48:45
leave it like this in project information
02:48:47
or here
02:48:50
I will try In summary, I can leave it like this,
02:48:55
very well, we are going to come to the project,
02:48:57
then we would have here to change the
02:49:00
time as we had established, then
02:49:03
calculate the project more or less the
02:49:05
costs, all that or establish a
02:49:08
baseline that we have previously
02:49:10
specified how the project will be at the
02:49:12
beginning. project and then with it
02:49:15
compared to the progress we have
02:49:17
had we could not move the project
02:49:20
to associate with another in the
02:49:23
status date is the current one we could put or
02:49:27
for example 5 and I say accept then
02:49:30
we would have a status date and
02:49:33
update the project based on it
02:49:36
very well here would be the line that
02:49:39
tells me the status date
02:49:43
here with this green line
02:49:47
more or less up to the top
02:49:49
we are going to see
02:49:52
now yes
02:49:54
this is more for more than visuals to
02:49:57
establish more or less up to where it would be
02:50:01
that we have made progress in the project is
02:50:03
very similar to establishing a baseline and in
02:50:06
fact the baseline takes into account the
02:50:08
status date this we have made
02:50:11
many changes we can update the
02:50:13
project to the current date
02:50:17
here very well the progress and all that and
02:50:21
for Lastly we would have the spelling positions
02:50:25
if I have made a mistake I can
02:50:26
change them very well basically that
02:50:29
would be in terms of the
02:50:31
program options of the majority that we have
02:50:35
seen of the programs focused more on
02:50:37
the program itself in question let's not
02:50:40
forget that we have another
02:50:41
complete course more focused in the project in
02:50:45
our in the order that we have just seen
02:50:47
one by one if it does not start from where
02:50:51
the project starts mods the modified one
02:50:54
from the beginning establishes the
02:50:55
schedule
02:50:57
and adding resources all that based on the
02:51:00
project as such not on the program as
02:51:04
as in itself as we have just seen
02:51:07
how we have done it in the previous
02:51:08
word excel power point courses on this
02:51:11
occasion we have done it one by
02:51:13
one tab by tab but in the other
02:51:15
project course we sat more on the
02:51:19
project in question

Description:

En este curso de Microsoft Project 2021 estaremos viendo las siguientes opciones: 0. BIENVENIDA - 00:00 1. INTRODUCCIÓN - 00:09 2. ARCHIVO - 04:34 - Inicio - Nuevo - Abrir - Información - Guardar - Guardar como - Imprimir - Compartir - Exportar - Cerrar - Cuenta - Comentarios - Opciones 3. INTERFAZ Y VISTA - 21:28 - Barra de herramientas rápidas - Cinta de opciones - Escala de tiempo - Escala de tiempo - Detalles - Barra de vista - Programación de tarea manual o automática - Cambio de vistas - Zoom 4. TAREA - 38:03 - Ver - Portapapeles - Fuente - Programación - Tareas - Insertar - Propiedades - Edición 5. DIAGRAMA DE GANTT - 01:28:26 - Formato - Columnas - Estilos de barra - Estilo de diagrama de Gantt - Mostrar u ocultar - Dibujo 6. ESCALA DE TIEMPO - 01:56:09 - Insertar - Agrupar - Quitar 7. RECURSO - 02:11:30 - Agregar - Asignación - Información 8. INFORME - 02:30:40 - Crear - Personalizar 9. PROYECTO - 02:40:30 - Configuración - Calendario ============================== Donaciones: https://www.paypal.com/donate/ ============================== Realizamos Páginas Web: https://www.habilweb.com/ ------------------------------------------------------------------------

Preparing download options

popular icon
Popular
hd icon
HD video
audio icon
Only sound
total icon
All
* — If the video is playing in a new tab, go to it, then right-click on the video and select "Save video as..."
** — Link intended for online playback in specialized players

Questions about downloading video

mobile menu iconHow can I download "CURSO DE PROJECT 2021" video?mobile menu icon

  • http://unidownloader.com/ website is the best way to download a video or a separate audio track if you want to do without installing programs and extensions.

  • The UDL Helper extension is a convenient button that is seamlessly integrated into YouTube, Instagram and OK.ru sites for fast content download.

  • UDL Client program (for Windows) is the most powerful solution that supports more than 900 websites, social networks and video hosting sites, as well as any video quality that is available in the source.

  • UDL Lite is a really convenient way to access a website from your mobile device. With its help, you can easily download videos directly to your smartphone.

mobile menu iconWhich format of "CURSO DE PROJECT 2021" video should I choose?mobile menu icon

  • The best quality formats are FullHD (1080p), 2K (1440p), 4K (2160p) and 8K (4320p). The higher the resolution of your screen, the higher the video quality should be. However, there are other factors to consider: download speed, amount of free space, and device performance during playback.

mobile menu iconWhy does my computer freeze when loading a "CURSO DE PROJECT 2021" video?mobile menu icon

  • The browser/computer should not freeze completely! If this happens, please report it with a link to the video. Sometimes videos cannot be downloaded directly in a suitable format, so we have added the ability to convert the file to the desired format. In some cases, this process may actively use computer resources.

mobile menu iconHow can I download "CURSO DE PROJECT 2021" video to my phone?mobile menu icon

  • You can download a video to your smartphone using the website or the PWA application UDL Lite. It is also possible to send a download link via QR code using the UDL Helper extension.

mobile menu iconHow can I download an audio track (music) to MP3 "CURSO DE PROJECT 2021"?mobile menu icon

  • The most convenient way is to use the UDL Client program, which supports converting video to MP3 format. In some cases, MP3 can also be downloaded through the UDL Helper extension.

mobile menu iconHow can I save a frame from a video "CURSO DE PROJECT 2021"?mobile menu icon

  • This feature is available in the UDL Helper extension. Make sure that "Show the video snapshot button" is checked in the settings. A camera icon should appear in the lower right corner of the player to the left of the "Settings" icon. When you click on it, the current frame from the video will be saved to your computer in JPEG format.

mobile menu iconWhat's the price of all this stuff?mobile menu icon

  • It costs nothing. Our services are absolutely free for all users. There are no PRO subscriptions, no restrictions on the number or maximum length of downloaded videos.