background top icon
background center wave icon
background filled rhombus icon
background two lines icon
background stroke rhombus icon

Download "Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов"

input logo icon
Video tags
|

Video tags

новатэк
газпром
санкции
газопровод мурманск
путин
газ
сжиженный газ
арктик спг
россия
производство
спг
промышленность
производство спг
новатэк газовозы
ямал спг
novatek
рф
мурманский спг путин
мурманский спг
сжиженный природный газ
цена на газ
арктик спг 2
российский газ
поставки спг
новости
спг россия
экономика
поставки газа
газификация россии
поставки спг в европу
спг в россии
газопровод
геоэнергетика
геоэнергетика инфо
геоэнергетика инфо ютуб
марцинкевич
политика
Subtitles
|

Subtitles

subtitles menu arrow
  • ruRussian
Download
00:00:00
[music]
00:00:06
Hello Dear viewers on the air
00:00:08
geoenergy info with you Mikhail Kokarev
00:00:11
and Boris Levich Martsinkevich Hello
00:00:13
Boris Levich Good afternoon everyone on the sidelines of the
00:00:14
Russian energy week, the head of the
00:00:16
Novatek company Leonid Mikhelson
00:00:18
told reporters that the construction of a
00:00:20
gas pipeline along the Volkhov route
00:00:22
Kostomukshi Murmansk Belan Kamenko
00:00:24
will be carried out by his company generally the total
00:00:27
duration of the route is almost 1400 km
00:00:31
tzi mono 40 billion kume per year Bori
00:00:36
Could you tell us what this route is about and
00:00:38
what it’s all about? Well, by and
00:00:41
large, this is some kind of completely new stage
00:00:43
in the fuel and energy complex of
00:00:45
Russia Let’s
00:00:46
even say frankly It’s not very clear where to
00:00:50
start, the fact that the Murmansk
00:00:58
region is united and the Dream that there will be gas supply
00:01:05
they have been dreaming about this for quite a long time
00:01:08
since the time when gasification began in
00:01:11
Soviet times, but somehow everything doesn’t
00:01:14
work out, even at one time there was a
00:01:18
thought from the sea with Shtokman
00:01:21
laying a pipe for this project at the skoye field,
00:01:28
new
00:01:30
gas tanks were a really big
00:01:33
problem, and since some of the
00:01:36
mining processing enterprises
00:01:38
were closed, Rosatom also has a problem. The
00:01:40
Kola Nuclear Power Plant
00:01:43
does not
00:01:45
receive
00:01:47
load at night; closed factories have nowhere to put
00:01:51
electricity; in general, everyone is somehow
00:01:53
not feeling well; For its Atik
00:01:57
spg2 project, the Novatek company
00:02:01
built a plant near Murmansk in the village of Belokamenka
00:02:06
after the experience gained before
00:02:08
the construction of Yamal LNG, everything is on the shore,
00:02:12
but the shore of Yamal is permafrost,
00:02:15
so the construction of a
00:02:16
gas plant for liquefying natural gas
00:02:19
on permafrost means the import of millions of
00:02:22
cubic meters of gravel in order to
00:02:25
provide a foundation for all this, it is
00:02:28
expensive for a long time and
00:02:30
I understand that during construction,
00:02:32
how did this idea of ​​a
00:02:35
gravity
00:02:37
platform come about? That is, how would this describe a
00:02:41
large large barge? A
00:02:45
concrete hold is a tank for storing
00:02:49
finished
00:02:50
LNG; all equipment; all liquefaction lines
00:02:53
are being assembled in factory conditions,
00:02:56
this is the largest, the size of football
00:03:00
fields, a huge workshop where everything is
00:03:01
assembled and tugboats deliver it along the Northern Sea Route
00:03:07
closer to the shore. Where
00:03:11
gas is produced in this case, the
00:03:14
Arctic SP2 project is the
00:03:18
Gdan Peninsula; we are already accustomed to the name Yamal; gun
00:03:22
is Gdan - this is the Eastern coast. In the
00:03:25
Gulf of Ob, there would be some
00:03:28
more
00:03:31
other deposits,
00:03:33
morning deposits, in this form, the finished
00:03:36
technological line is delivered to the
00:03:38
coast of
00:03:39
Gaina, filled with the appropriate
00:03:42
container with just soil, stones, sand
00:03:45
so that the platform stands on the bottom of
00:03:47
the sea, all the problems of capital
00:03:51
construction on permafrost disappear, then all that
00:03:54
remains is to build the coastal ones
00:03:58
construction of a gas pipeline from the field, and
00:04:02
so on and so forth, the work is ready, the
00:04:05
result is cheaper, a little
00:04:08
faster, which is what we actually
00:04:10
saw,
00:04:11
the only thing we saw, of course, is that the problem with
00:04:13
import substitution has not gone away.
00:04:15
Initially, the plant planned to build on
00:04:18
the technologies of a German company, which
00:04:21
left, but is ready by this time
00:04:28
x large good
00:04:32
technology the first technological line
00:04:34
was 70% ready and the shift in rights was
00:04:38
generally small by less than a year they were
00:04:41
moved up managed to
00:04:43
finish information on how much What
00:04:47
part of the equipment our
00:04:50
company produces already in Russia Vatek does not provide this in
00:04:53
open sources it cannot be found
00:04:55
but it seems Whatever the degree of localization, the
00:05:00
Belkamenka plant is designed for
00:05:02
the construction of two
00:05:04
technological lines at the same time, respectively,
00:05:07
after the second production
00:05:09
line goes on its way to the
00:05:13
Gdan Peninsula, the production capacity is free
00:05:18
and in order to receive a load for this
00:05:22
plant of
00:05:23
factories in order not to
00:05:26
stop the
00:05:28
new Novatek has appeared rnsk LNG project
00:05:32
three more technological lines, that is,
00:05:35
they have launched a second one for Artik LNG. We can
00:05:38
start assembling the first one for Murmansk
00:05:41
LNG. Also in Murmansk, that is, there is such a
00:05:45
large production base for
00:05:48
Murmansk for the Murmansk region. It is
00:05:50
possible that Novatek will
00:05:53
hire the region even for
00:05:58
this burner
00:06:00
Vakh EU loading will be constant This cannot be
00:06:05
ruled out and the question arose, strictly
00:06:07
speaking, where to get
00:06:09
LNG from the fields in which
00:06:13
it operates, it is enough, that is, to produce gas in the
00:06:15
volume in which the RNS of LNG is needed, this is
00:06:18
also
00:06:20
198 ml, then in terms of a usual amount, the
00:06:26
question is how to deliver
00:06:30
and here is the same case when there would be no
00:06:33
happiness Yes, misfortune helped,
00:06:35
terrorist acts were committed at the bottom of the
00:06:38
Baltic Sea, an explosion of northern flows
00:06:41
This means that the entire gas pipeline
00:06:44
that Gazprom built to
00:06:47
supply gas to
00:06:49
Germany The coastal infrastructure is intact
00:06:52
on the seashore, we go beyond the pipes
00:06:54
No two northern flows - this is 110 LR
00:06:57
Kuma this is a lot of supply
00:07:02
there is no total drop in production for Gazprom is
00:07:06
quite
00:07:08
large, such a natural question arose:
00:07:10
Where to put this amount of gas
00:07:13
and here everything came together Murmansk and
00:07:16
Karelia, which live without
00:07:18
pipeline
00:07:20
gas, the Murmansk LNG project, which is
00:07:28
needed from Gazprom gas is extracted, the entire
00:07:31
gas transportation system is laid out by the Armed Forces,
00:07:34
united into a single gas
00:07:36
supply system, no sales, everything
00:07:40
coincides. So this would seem to be a
00:07:43
small Information message,
00:07:45
but quite a large layer of events
00:07:49
that behind it stands a capacity of 40 billion,
00:07:58
then cumulatively about 8 billion cubic meters per year
00:08:02
in in the event that the entire fuel oil boiler room
00:08:04
is converted
00:08:05
to natural gas, that is, a small
00:08:09
reserve for Mrumansk LNG 30 billion is not
00:08:13
needed 28 in fact, that is, there is
00:08:15
still a small reserve for both Karelia and the
00:08:18
Murmansk region, this is such a reserve
00:08:21
for increasing capacity and at the same time
00:08:24
the problem is removed Rosatom, which I
00:08:26
was talking about, the lack of night load for the
00:08:29
Kola Nuclear Power Plant in the
00:08:31
event that the plant starts operating,
00:08:33
gas damage there is a continuous cycle, that
00:08:37
is, Rosatom problems are removed, it
00:08:40
can provide electricity to the
00:08:42
Murmansk LNG project,
00:08:46
accordingly, another problem is solved
00:08:48
for the Murmansk region, the nuclear
00:08:52
power plant
00:08:58
produces
00:09:00
Lova
00:09:02
Eveno with the mind of those reserves for natural
00:09:07
gas that I said, it is possible to arrange
00:09:09
additional gas
00:09:11
power plants. At the same time, several
00:09:13
problems that exist in Russia are being
00:09:15
solved. The problem of how many nuclear
00:09:17
power plants is being solved; the issue of gasification of Karelian
00:09:20
and Murmansk region is being solved;
00:09:28
it is being solved
00:09:30
if Gazprom is supplied for the shift; there is
00:09:33
no news about this yet
00:09:37
so far the only decision is that a
00:09:39
construction
00:09:40
loan will be allowed, will it be possible, some of our own
00:09:44
options are extracting gas there, Nama
00:09:49
transfers
00:09:51
it, the
00:09:58
volume is worth a cubic meter so that
00:10:01
this problem does not arise. So, in my opinion, this is
00:10:04
such a big step, we will wait for the
00:10:06
details for now
00:10:09
we have a message Personally from Leonid
00:10:12
Mikhelson and the version presented by
00:10:15
Kommersant that Vatek
00:10:18
will build a pipe and then sell it to Gazprom.
00:10:21
But there were no comments on this from either
00:10:23
Gazprom or Novatek.
00:10:26
I understand that
00:10:29
we need to chase a sensation. But I prefer the
00:10:33
regime option when the same
00:10:35
news appears. at least from two
00:10:37
independent sources it is news But
00:10:39
for now this is a version version comment
00:10:42
Let's wait until next time
00:10:44
because I'm sure that either the
00:10:47
press service of Novatek should
00:10:49
report something or the press service of Gazprom is
00:10:52
still
00:10:58
Cost's opinion if Novatek everything will work out,
00:11:02
then the directorate that was created by
00:11:05
Gazprom, which was involved in calculating the
00:11:08
route, the route is not easy. Karelia is
00:11:12
granite,
00:11:14
so it won’t be possible to bury the gas pipeline there.
00:11:17
Some other
00:11:18
engineering
00:11:19
solutions are needed in a good way. Of course, all the
00:11:22
developments that arose there are here. The
00:11:24
project team was created at the beginning of
00:11:26
the year transfer the idea so that
00:11:31
he doesn’t do the same job a second
00:11:33
time, don’t waste time on this. If everything
00:11:37
works out as it is now seen, by the
00:11:39
year 2020 we can get a
00:11:41
rather amazing option for Karelia
00:11:43
and the Murmansk region with pipeline
00:11:47
natural
00:11:49
gas from Gazprom. became a little
00:11:52
less of a headache and which has
00:11:55
the opportunity to continue to load its
00:11:57
plant at the
00:12:01
dawn of projects
00:12:05
in Europe in general and Germany in particular
00:12:09
for which, in fact, the
00:12:11
entire ground infrastructure of both
00:12:13
northern streams was built separately. Hello That is,
00:12:16
even
00:12:18
if it leaves the political Olympus in
00:12:21
Germany my
00:12:27
favorite, the gas that comes to the shores of the
00:12:30
Baltic Sea will slowly
00:12:32
disperse into different projects. We are waiting for new
00:12:34
projects from
00:12:37
Gazprom itself. Let’s hope that this
00:12:39
difficult moment when volumes have sharply decreased and
00:12:45
Gazprom’s profits have therefore decreased will remain a thing of
00:12:48
the past, so in my opinion the news is
00:12:50
extremely optimistic Thank you very much
00:12:53
Boris Leonidovich thank the viewers for
00:12:55
watching, be sure
00:12:56
to subscribe to channel IO only there you
00:13:00
will find the latest news in the
00:13:01
energy sector See you soon, do not forget
00:13:04
to subscribe to our channel in YouTube Do not
00:13:06
forget to distribute our videos on
00:13:08
your social networks, this will help the
00:13:10
development of our project Thank you all
00:13:13
for your attention all the
00:13:20
best [music]

Description:

Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов. Борис Марцинкевич. По решению правительства НОВАТЭК построит газопровод от Волхова до Мурманска, а его мощность составит 40 млрд куб. м в год. По трубе будет направлен газ с месторождений компании для производства СПГ на новом заводе. Мурманский СПГ позволит решить три задачи. Во-первых, задействовать профицитные мощности Кольской АЭС Росатома более 1 ГВт электроэнергии. Линии сжижения на Мурманском СПГ будут работать на российском электрическом приводе, а не на мощных газовых турбинах, которые больше не поставляются в Россию из-за западных санкций. Три линии будут требовать по 500 МВт энергии каждая. Подробнее в новом выпуске Геоэнергетика Инфо Наш телеграм: https://t.me/geonrgru Наш Дзен https://dzen.ru/geonrgru Станьте спонсором канала CПОНСОР.РУ ► https://sponsr.ru/geonrgru/ Поддержать канал: Сбербанк - 4274 3200 6731 4487 Максим Р. Тинькофф - 4377 7237 6815 3060 Максим Р. ВТБ - 2200 2407 5683 3253 Максим Р. https://yoomoney.ru/to/410018728624134 (донат сервис) Пожалуйста НЕ указывайте ничего в комментариях и назначении перевода! VK ► https://vk.com/geonrgru ЯНДЕКС.ДЗЕН ► https://dzen.ru/geonrgru Сайт Геоэнергетика https://geonrg.ru/ Реклама, сотрудничество: https://t.me/radaykinpro [email protected] Обязательно подписывайтесь на канал, ставьте все уведомления, ставьте лайки и пишите комментарии! Вы помогаете продвигать канал!

Preparing download options

popular icon
Popular
hd icon
HD video
audio icon
Only sound
total icon
All
* — If the video is playing in a new tab, go to it, then right-click on the video and select "Save video as..."
** — Link intended for online playback in specialized players

Questions about downloading video

mobile menu iconHow can I download "Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов" video?mobile menu icon

  • http://unidownloader.com/ website is the best way to download a video or a separate audio track if you want to do without installing programs and extensions.

  • The UDL Helper extension is a convenient button that is seamlessly integrated into YouTube, Instagram and OK.ru sites for fast content download.

  • UDL Client program (for Windows) is the most powerful solution that supports more than 900 websites, social networks and video hosting sites, as well as any video quality that is available in the source.

  • UDL Lite is a really convenient way to access a website from your mobile device. With its help, you can easily download videos directly to your smartphone.

mobile menu iconWhich format of "Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов" video should I choose?mobile menu icon

  • The best quality formats are FullHD (1080p), 2K (1440p), 4K (2160p) and 8K (4320p). The higher the resolution of your screen, the higher the video quality should be. However, there are other factors to consider: download speed, amount of free space, and device performance during playback.

mobile menu iconWhy does my computer freeze when loading a "Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов" video?mobile menu icon

  • The browser/computer should not freeze completely! If this happens, please report it with a link to the video. Sometimes videos cannot be downloaded directly in a suitable format, so we have added the ability to convert the file to the desired format. In some cases, this process may actively use computer resources.

mobile menu iconHow can I download "Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов" video to my phone?mobile menu icon

  • You can download a video to your smartphone using the website or the PWA application UDL Lite. It is also possible to send a download link via QR code using the UDL Helper extension.

mobile menu iconHow can I download an audio track (music) to MP3 "Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов"?mobile menu icon

  • The most convenient way is to use the UDL Client program, which supports converting video to MP3 format. In some cases, MP3 can also be downloaded through the UDL Helper extension.

mobile menu iconHow can I save a frame from a video "Новый Мегапроект НОВАТЭК: Газопровод Мурманск - Волхов"?mobile menu icon

  • This feature is available in the UDL Helper extension. Make sure that "Show the video snapshot button" is checked in the settings. A camera icon should appear in the lower right corner of the player to the left of the "Settings" icon. When you click on it, the current frame from the video will be saved to your computer in JPEG format.

mobile menu iconWhat's the price of all this stuff?mobile menu icon

  • It costs nothing. Our services are absolutely free for all users. There are no PRO subscriptions, no restrictions on the number or maximum length of downloaded videos.